X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144162213000

Well Details

Well ID: 0144162213000
Loading map...
Location: 00/13-22-014-16W4/0
Location Alias: 00/13-22-14-16 W4M
Location Alias 2: 00/13-22-014-16 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 16
Section: 22
County/Municipality: Municipal District of Taber
Well Name: NORCEN ENCHANT 13-22-14-16
Operator Name: Canadian Natural Resources Limited
License Number: 0187891
License Date: 1996-05-21
License Status: Amended
Spud Date: 1996-06-18
Final Drill Date: 1996-06-30
Well Total Depth: 1505.00 m
Surface Hole Latitude: 50.186793
Surface Hole Longitude: -112.119162

For data sources see[1][2]

Well History

Date Event
1996-05-21 Obtained License
1996-06-20 Surface Casing Operation Performed
1996-06-21 Direction Drilling Operation Performed - Deviate
1996-06-30 Finished Drilling
1996-06-30 Well Log Performed
1996-06-30 Well Mode changed to Drilled and Cased
1996-07-05 Production Casing Operation Performed
1996-07-05 Rig Released
1996-07-08 Well Log Performed
1996-07-23 Perforation Treatment Performed - Jet Perforation
1996-07-25 Perforation Treatment Performed - Fractured
1996-07-30 Perforation Treatment Performed - Jet Perforation
1996-08-03 Perforation Treatment Performed - Cement Squeeze
1996-08-03 Plug Back Performed
1996-08-14 Well Began Production
1996-08-14 Well Fluid changed to Crude Oil
1996-08-14 Well Mode changed to Pumping
2005-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-03-07 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-21 532.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-23 Perforation 1448.50 1455.00 17
2005-03-07 Cement Squeeze 1017.00 1020.00 0
1996-07-23 Perforation 1457.50 1461.50 17
1996-07-23 Perforation 1463.50 1468.50 17
1996-07-23 Perforation 1471.50 1472.80 17
1996-07-25 Fracture 1448.50 1472.80 0
1996-07-30 Perforation 1071.00 1083.00 13
1996-08-03 Cement Squeeze 1071.00 1089.50 0
2005-02-11 Acid Treatment 1448.50 1472.80 0
2005-02-18 Perforation 1017.00 1020.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3165 0.0 0.0 0.0
1997 8392 0.0 0.0 0.0
1998 8413 0.0 0.0 0.0
1999 8628 0.0 0.0 0.0
2000 7458 0.0 0.0 0.0
2001 7372 0.0 0.0 0.0
2002 8689 0.0 0.0 0.0
2003 8612 0.0 0.0 0.0
2004 8369 0.0 0.0 0.0
2005 7604 0.0 0.0 0.0
2006 7993 0.0 0.0 0.0
2007 7842 0.0 0.0 0.0
2008 7506 0.0 0.0 0.0
2009 8020 0.0 0.0 0.0
2010 8240 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8663 0.0 0.0 0.0
2013 8603 0.0 0.0 0.0
2014 8685 0.0 0.0 0.0
2015 8554 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 7455 0.0 0.0 0.0
2018 4053 0.0 0.0 0.0
2019 5422 0.0 0.0 0.0
2020 2123 0.0 0.0 0.0

For data sources see[6]

References