If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144162603002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.196495,"lon":-112.086431,"icon":""}]} |
Location: 00/03-26-014-16W4/2 | |
Location Alias: 00/03-26-14-16 W4M | |
Location Alias 2: 00/03-26-014-16 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 16 | |
Section: 26 | |
County/Municipality: Municipal District of Taber | |
Well Name: COP ENCHANT 3-26-14-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0309712 | |
License Date: 2004-06-04 | |
License Status: Suspension | |
Spud Date: 2004-06-22 | |
Final Drill Date: 2004-06-25 | |
Well Total Depth: 1007.00 m | |
Surface Hole Latitude: 50.196495 | |
Surface Hole Longitude: -112.086431 |
Date | Event |
---|---|
2004-06-04 | Obtained License |
2004-06-23 | Surface Casing Operation Performed |
2004-06-25 | Finished Drilling |
2004-06-25 | Well Mode changed to Drilled and Cased |
2004-06-26 | Well Log Performed |
2004-06-27 | Production Casing Operation Performed |
2004-06-27 | Rig Released |
2004-07-06 | Perforation Treatment Performed - Jet Perforation |
2004-07-06 | Well Log Performed |
2004-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-20 | Plug Back Performed |
2007-02-21 | Perforation Treatment Performed - Jet Perforation |
2007-02-21 | Well Log Performed |
2007-03-01 | Well Began Production |
2007-03-01 | Well Fluid changed to Gas |
2007-03-01 | Well Mode changed to Flowing |
2008-07-01 | Well Fluid changed to Gas |
2008-07-01 | Well Mode changed to Suspended |
2009-03-11 | Well Log Performed |
2009-03-14 | Perforation Treatment Performed - Cement Squeeze |
2009-03-14 | Plug Back Performed |
2009-03-14 | Well Fluid changed to Gas |
2009-03-14 | Well Mode changed to Abandoned Zone |
2009-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-15 | Perforation Treatment Performed - Jet Perforation |
2009-03-15 | Well Log Performed |
2009-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-20 | Perforation Treatment Performed - Jet Perforation |
2009-06-20 | Well Log Performed |
2009-06-21 | Perforation Treatment Performed - Remedial Casing |
2009-06-22 | Perforation Treatment Performed - Jet Perforation |
2009-06-22 | Well Log Performed |
2009-06-24 | Perforation Treatment Performed - Jet Perforation |
2009-06-24 | Perforation Treatment Performed - Remedial Casing |
2009-06-24 | Well Log Performed |
2009-06-25 | Perforation Treatment Performed - Remedial Casing |
2009-10-15 | Perforation Treatment Performed - Jet Perforation |
2009-10-15 | Well Log Performed |
2009-10-16 | Perforation Treatment Performed - Remedial Casing |
2009-10-22 | Perforation Treatment Performed - Jet Perforation |
2009-10-23 | Perforation Treatment Performed - Remedial Casing |
2010-04-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-04-27 | Perforation Treatment Performed - Jet Perforation |
2010-04-27 | Perforation Treatment Performed - Remedial Casing |
2010-04-27 | Well Log Performed |
2011-01-14 | Perforation Treatment Performed - Jet Perforation |
2011-02-08 | Perforation Treatment Performed - Jet Perforation |
2011-02-08 | Well Log Performed |
2011-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-09 | Perforation Treatment Performed - Remedial Casing |
2011-02-27 | Perforation Treatment Performed - Jet Perforation |
2011-02-27 | Well Log Performed |
2011-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-03-03 | Perforation Treatment Performed - Jet Perforation |
2011-03-03 | Well Log Performed |
2011-03-06 | Perforation Treatment Performed - Remedial Casing |
2011-03-12 | Perforation Treatment Performed - Cement Plug |
2011-03-12 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-28 | Well Log Performed |
2012-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-11-01 | Perforation Treatment Performed - Jet Perforation |
2012-11-01 | Well Log Performed |
2012-11-02 | Perforation Treatment Performed - Remedial Casing |
2012-11-03 | Perforation Treatment Performed - Jet Perforation |
2012-11-03 | Perforation Treatment Performed - Remedial Casing |
2012-11-03 | Well Log Performed |
2012-12-14 | Perforation Treatment Performed - Jet Perforation |
2012-12-14 | Well Log Performed |
2012-12-17 | Perforation Treatment Performed - Remedial Casing |
2013-02-25 | Perforation Treatment Performed - Jet Perforation |
2013-02-27 | Perforation Treatment Performed - Remedial Casing |
2013-02-28 | Perforation Treatment Performed - Jet Perforation |
2013-02-28 | Well Log Performed |
2013-03-01 | Perforation Treatment Performed - Remedial Casing |
2014-01-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-01-30 | Perforation Treatment Performed - Jet Perforation |
2014-01-30 | Well Log Performed |
2014-02-01 | Perforation Treatment Performed - Remedial Casing |
2014-02-02 | Perforation Treatment Performed - Jet Perforation |
2014-02-02 | Perforation Treatment Performed - Remedial Casing |
2014-02-02 | Well Log Performed |
2014-11-15 | Perforation Treatment Performed - Jet Perforation |
2014-11-15 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-07-06 | Perforation | 960.50 | 962.00 | 17 |
2009-06-20 | Perforation | 632.00 | 633.00 | 18 |
2009-06-20 | Perforation | 626.50 | 627.50 | 18 |
2009-06-20 | Perforation | 622.00 | 623.00 | 18 |
2009-06-21 | Remedial Casing Cementing | 622.00 | 633.00 | 0 |
2009-06-22 | Perforation | 566.00 | 567.00 | 18 |
2009-06-24 | Perforation | 540.50 | 541.50 | 18 |
2009-06-24 | Remedial Casing Cementing | 566.00 | 567.00 | 0 |
2009-06-25 | Remedial Casing Cementing | 540.50 | 541.50 | 0 |
2009-10-15 | Perforation | 497.00 | 498.00 | 18 |
2009-10-16 | Remedial Casing Cementing | 497.00 | 498.00 | 0 |
2004-08-22 | Acid Treatment | 960.50 | 962.00 | 0 |
2009-10-22 | Perforation | 446.50 | 447.50 | 13 |
2009-10-23 | Remedial Casing Cementing | 446.50 | 447.50 | 0 |
2010-04-27 | Perforation | 446.50 | 448.50 | 18 |
2010-04-27 | Acid Treatment | 446.50 | 448.50 | 0 |
2010-04-27 | Remedial Casing Cementing | 446.50 | 448.50 | 0 |
2011-01-14 | Perforation | 727.50 | 728.50 | 13 |
2011-01-14 | Perforation | 740.50 | 741.50 | 13 |
2011-02-08 | Perforation | 688.00 | 690.00 | 18 |
2011-02-09 | Acid Treatment | 688.00 | 690.00 | 0 |
2011-02-09 | Remedial Casing Cementing | 688.00 | 690.00 | 0 |
2007-02-20 | Packing Device Capped w/Cement | 946.00 | 954.00 | 0 |
2011-02-27 | Perforation | 960.50 | 962.00 | 17 |
2011-03-03 | Perforation | 960.00 | 962.00 | 18 |
2011-03-03 | Acid Treatment | 960.00 | 962.50 | 0 |
2011-03-06 | Remedial Casing Cementing | 960.00 | 962.50 | 0 |
2011-03-12 | Open Hole/Barefoot Completion | 946.00 | 951.00 | 0 |
2011-03-12 | Cement Plug | 842.00 | 957.00 | 0 |
2012-10-31 | Packing Device Capped w/Cement | 714.00 | 723.00 | 0 |
2012-10-31 | Packing Device Capped w/Cement | 605.00 | 615.00 | 0 |
2012-11-01 | Perforation | 443.00 | 447.00 | 17 |
2012-11-01 | Perforation | 391.00 | 395.00 | 17 |
2007-02-21 | Perforation | 763.00 | 765.00 | 17 |
2012-11-02 | Remedial Casing Cementing | 443.00 | 447.00 | 0 |
2012-11-03 | Perforation | 395.00 | 397.00 | 18 |
2012-11-03 | Remedial Casing Cementing | 391.00 | 397.00 | 0 |
2012-12-14 | Perforation | 427.50 | 431.50 | 17 |
2012-12-17 | Remedial Casing Cementing | 427.50 | 431.50 | 0 |
2013-02-25 | Perforation | 572.50 | 577.00 | 18 |
2013-02-27 | Remedial Casing Cementing | 572.50 | 577.00 | 0 |
2013-02-28 | Perforation | 547.00 | 551.50 | 18 |
2013-03-01 | Remedial Casing Cementing | 547.00 | 551.50 | 0 |
2014-01-30 | Packing Device Capped w/Cement | 412.00 | 420.00 | 0 |
2009-03-14 | Cement Squeeze | 763.00 | 765.00 | 0 |
2014-01-30 | Packing Device Capped w/Cement | 377.00 | 385.00 | 0 |
2014-01-30 | Perforation | 315.00 | 320.00 | 18 |
2014-02-01 | Remedial Casing Cementing | 315.00 | 320.00 | 0 |
2014-02-02 | Perforation | 275.00 | 279.00 | 18 |
2014-02-02 | Remedial Casing Cementing | 275.00 | 279.00 | 0 |
2014-11-15 | Perforation | 263.00 | 266.00 | 18 |
2009-03-15 | Perforation | 740.50 | 741.50 | 13 |
2009-03-15 | Packing Device Capped w/Cement | 731.00 | 739.00 | 0 |
2009-03-15 | Perforation | 727.50 | 728.50 | 13 |
2009-06-19 | Packing Device Capped w/Cement | 711.00 | 719.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 6194 | 0.0 | 0.0 | 0.0 |
2008 | 2276 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-17 | No Incident Encountered | 0.00 | 0.00 |
2014-03-12 | No Incident Encountered | 0.00 | 0.00 |
2015-04-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]