X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144190808002

Well Details

Well ID: 0144190808002
Loading map...
Location: 00/08-08-014-19W4/2
Location Alias: 00/08-08-14-19 W4M
Location Alias 2: 00/08-08-014-19 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 08
County/Municipality: Municipal District of Taber
Well Name: SPHERE RETLAW 8-8-14-19
Operator Name: Sphere Energy Corp.
License Number: 0343181
License Date: 2005-11-22
License Status: RecCertified
Spud Date: 2005-11-25
Final Drill Date: 2005-11-25
Well Total Depth: 997.10 m
Surface Hole Latitude: 50.154515
Surface Hole Longitude: -112.557507

For data sources see[1][2]

Well History

Date Event
2005-11-22 Obtained License
2005-11-24 Surface Casing Operation Performed
2005-11-25 Finished Drilling
2005-11-25 Production Casing Operation Performed
2005-11-25 Well Mode changed to Drilled and Cased
2005-11-26 Rig Released
2005-11-30 Well Log Performed
2005-12-09 Perforation Treatment Performed - Jet Perforation
2005-12-21 Perforation Treatment Performed - Fractured
2006-12-05 Perforation Treatment Performed - Jet Perforation
2006-12-05 Well Log Performed
2006-12-11 Perforation Treatment Performed - Fractured
2008-04-08 Well Began Production
2008-04-08 Well Fluid changed to Gas
2008-04-08 Well Mode changed to Flowing
2008-07-14 Well Fluid changed to Gas
2008-07-14 Well Mode changed to Flowing
2008-11-10 Perforation Treatment Performed - Casing Patch (Over Perfs)
2008-11-10 Well Log Performed
2015-04-22 Perforation Treatment Performed - Cement Plug
2015-04-22 Plug Back Performed
2015-04-22 Well Fluid changed to Gas
2015-04-22 Well Mode changed to Abandoned Zone
2015-04-28 Well Abandoned
2015-04-28 Well Fluid changed to Gas
2015-04-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-09 Perforation 812.00 812.90 17
2005-12-09 Perforation 810.50 811.00 17
2005-12-09 Perforation 809.40 810.10 17
2005-12-09 Perforation 807.50 808.00 17
2005-12-21 Fracture 807.50 812.90 0
2006-12-05 Perforation 334.80 336.30 17
2006-12-11 Fracture 334.80 336.30 0
2008-11-10 Casing Patch 334.80 336.30 0
2015-04-22 Cement Plug 319.00 830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 6024 0.0 0.0 0.0
2009 6485 0.0 0.0 0.0
2010 6737 0.0 0.0 0.0
2011 8583 0.0 0.0 0.0
2012 1137 0.0 0.0 0.0
2013 7724 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 2811 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References