If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144192413030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.196029,"lon":-112.48315,"icon":""}]} |
Location: 03/13-24-014-19W4/0 | |
Location Alias: 03/13-24-14-19 W4M | |
Location Alias 2: 03/13-24-014-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 19 | |
Section: 24 | |
County/Municipality: Municipal District of Taber | |
Well Name: 1473649AB RETLAW 13-24-14-19 | |
Operator Name: Zargon Oil & Gas Ltd. | |
License Number: 0325991 | |
License Date: 2005-02-09 | |
License Status: Issued | |
Spud Date: 2005-03-13 | |
Final Drill Date: 2005-03-24 | |
Well Total Depth: 1492.00 m | |
Surface Hole Latitude: 50.196029 | |
Surface Hole Longitude: -112.483150 |
Date | Event |
---|---|
2005-02-09 | Obtained License |
2005-03-14 | Surface Casing Operation Performed |
2005-03-17 | Direction Drilling Operation Performed - Horizontal |
2005-03-20 | Production Casing Operation Performed |
2005-03-24 | Finished Drilling |
2005-03-24 | Rig Released |
2005-03-24 | Well Mode changed to Drilled and Cased |
2005-04-10 | Perforation Treatment Performed - Open-Hole Completion |
2005-05-03 | Well Began Production |
2005-05-03 | Well Fluid changed to Crude Oil |
2005-05-03 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-03-17 | 997.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-04-10 | Open Hole/Barefoot Completion | 1211.00 | 1492.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 5433 | 0.0 | 0.0 | 0.0 |
2006 | 7991 | 0.0 | 0.0 | 0.0 |
2007 | 8250 | 0.0 | 0.0 | 0.0 |
2008 | 8244 | 0.0 | 0.0 | 0.0 |
2009 | 8435 | 0.0 | 0.0 | 0.0 |
2010 | 7255 | 0.0 | 0.0 | 0.0 |
2011 | 5163 | 0.0 | 0.0 | 0.0 |
2012 | 8549 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 7413 | 0.0 | 0.0 | 0.0 |
2015 | 6674 | 0.0 | 0.0 | 0.0 |
2016 | 8564 | 0.0 | 0.0 | 0.0 |
2017 | 8651 | 0.0 | 0.0 | 0.0 |
2018 | 8684 | 0.0 | 0.0 | 0.0 |
2019 | 8588 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]