If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154031806030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.255958,"lon":-110.409071,"icon":""}]} |
Location: 03/06-18-015-03W4/0 | |
Location Alias: 03/06-18-15-03 W4M | |
Location Alias 2: 03/06-18-015-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 03 | |
Section: 18 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 6-18-15-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0369871 | |
License Date: 2006-12-21 | |
License Status: Issued | |
Spud Date: 2007-01-20 | |
Final Drill Date: 2007-01-21 | |
Well Total Depth: 490.00 m | |
Surface Hole Latitude: 50.255958 | |
Surface Hole Longitude: -110.409071 |
Date | Event |
---|---|
2006-12-21 | Obtained License |
2007-01-20 | Surface Casing Operation Performed |
2007-01-21 | Finished Drilling |
2007-01-21 | Production Casing Operation Performed |
2007-01-21 | Rig Released |
2007-01-21 | Well Mode changed to Drilled and Cased |
2007-02-10 | Well Log Performed |
2007-06-04 | Well Log Performed |
2007-06-05 | Perforation Treatment Performed - Jet Perforation |
2007-06-22 | Perforation Treatment Performed - Fractured |
2007-07-03 | Well Began Production |
2007-07-03 | Well Fluid changed to Gas |
2007-07-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-06-05 | Perforation | 352.50 | 354.50 | 7 |
2007-06-22 | Fracture | 352.50 | 440.00 | 0 |
2007-06-05 | Perforation | 370.50 | 372.50 | 7 |
2007-06-05 | Perforation | 384.00 | 386.00 | 7 |
2007-06-05 | Perforation | 394.50 | 395.50 | 7 |
2007-06-05 | Perforation | 399.00 | 400.00 | 7 |
2007-06-05 | Perforation | 416.00 | 418.00 | 7 |
2007-06-05 | Perforation | 425.50 | 427.50 | 7 |
2007-06-05 | Perforation | 436.00 | 437.00 | 7 |
2007-06-05 | Perforation | 439.00 | 440.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 3973 | 0.0 | 0.0 | 0.0 |
2008 | 7023 | 0.0 | 0.0 | 0.0 |
2009 | 8482 | 0.0 | 0.0 | 0.0 |
2010 | 8727 | 0.0 | 0.0 | 0.0 |
2011 | 8527 | 0.0 | 0.0 | 0.0 |
2012 | 8607 | 0.0 | 0.0 | 0.0 |
2013 | 8588 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8231 | 0.0 | 0.0 | 0.0 |
2018 | 8076 | 0.0 | 0.0 | 0.0 |
2019 | 8047 | 0.0 | 0.0 | 0.0 |
2020 | 1874 | 0.0 | 0.0 | 0.0 |
For data sources see[5]