X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154050808000

Well Details

Well ID: 0154050808000
Loading map...
Location: 00/08-08-015-05W4/0
Location Alias: 00/08-08-15-05 W4M
Location Alias 2: 00/08-08-015-05 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 05
Section: 08
County/Municipality: Cypress County
Well Name: Canlin SUFFIELD 8-8-15-5
Operator Name: Canlin Energy Corporation
License Number: 0055365
License Date: 1975-10-14
License Status: Issued
Spud Date: 1975-10-18
Final Drill Date: 1975-10-20
Well Total Depth: 356.00 m
Surface Hole Latitude: 50.244096
Surface Hole Longitude: -110.648687

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-14 Obtained License
1975-10-20 Finished Drilling
1975-10-20 Production Casing Operation Performed
1975-10-20 Well Mode changed to Drilled and Cased
1975-10-25 Perforation Treatment Performed - Fractured
1975-10-25 Perforation Treatment Performed - Jet Perforation
1975-10-26 Perforation Treatment Performed - Fractured
1975-10-26 Perforation Treatment Performed - Selective Jet Perforations
1975-11-06 Well Began Production
1975-11-06 Well Fluid changed to Gas
1975-11-06 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-25 Perforation 317.60 320.00 3
1975-10-26 Selective Jet Perforations 221.60 225.90 0
1975-10-26 Selective Jet Perforations 226.80 228.00 0
1975-10-26 Selective Jet Perforations 229.20 231.00 0
1975-10-26 Selective Jet Perforations 234.70 235.30 0
1975-10-26 Selective Jet Perforations 236.20 239.30 0
1975-10-26 Selective Jet Perforations 240.20 248.70 0
1975-10-26 Selective Jet Perforations 249.30 249.30 0
1975-10-26 Fracture 190.80 249.30 0
1975-10-25 Perforation 326.10 326.70 3
1975-10-25 Perforation 286.80 289.30 3
1975-10-25 Perforation 296.30 297.50 3
1975-10-25 Fracture 286.80 326.70 0
1975-10-26 Selective Jet Perforations 190.80 197.20 0
1975-10-26 Selective Jet Perforations 197.80 202.70 0
1975-10-26 Selective Jet Perforations 203.30 206.00 0
1975-10-26 Selective Jet Perforations 212.40 219.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1273 0.0 0.0 0.0
1976 8349 0.0 0.0 0.0
1977 7889 0.0 0.0 0.0
1978 7131 0.0 0.0 0.0
1979 6292 0.0 0.0 0.0
1980 6816 0.0 0.0 0.0
1981 8684 0.0 0.0 0.0
1982 4051 0.0 0.0 0.0
1983 4580 0.0 0.0 0.0
1984 7510 0.0 0.0 0.0
1985 8640 0.0 0.0 0.0
1986 5638 0.0 0.0 0.0
1987 8415 0.0 0.0 0.0
1988 8726 0.0 0.0 0.0
1989 8746 0.0 0.0 0.0
1990 8753 0.0 0.0 0.0
1991 8755 0.0 0.0 0.0
1992 8773 0.0 0.0 0.0
1993 8685 0.0 0.0 0.0
1994 8756 0.0 0.0 0.0
1995 8742 0.0 0.0 0.0
1996 8776 0.0 0.0 0.0
1997 8758 0.0 0.0 0.0
1998 8737 0.0 0.0 0.0
1999 8721 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8740 0.0 0.0 0.0
2004 8739 0.0 0.0 0.0
2005 8470 0.0 0.0 0.0
2006 8546 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8628 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8459 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References