X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154160401000

Well Details

Well ID: 0154160401000
Loading map...
Location: 00/01-04-015-16W4/0
Location Alias: 00/01-04-15-16 W4M
Location Alias 2: 00/01-04-015-16 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 16
Section: 04
County/Municipality: Municipal District of Taber
Well Name: CNRL ENCHANT 1-4-15-16
Operator Name: Canadian Natural Resources Limited
License Number: 0165303
License Date: 1994-02-22
License Status: Issued
Spud Date: 1994-04-18
Final Drill Date: 1994-04-27
Well Total Depth: 1433.00 m
Surface Hole Latitude: 50.225894
Surface Hole Longitude: -112.139079

For data sources see[1][2]

Well History

Date Event
1994-02-22 Obtained License
1994-04-18 Well Log Performed
1994-04-19 Surface Casing Operation Performed
1994-04-27 Drill Stem Test Performed
1994-04-27 Finished Drilling
1994-04-27 Well Log Performed
1994-04-27 Well Mode changed to Drilled and Cased
1994-04-29 Production Casing Operation Performed
1994-04-29 Rig Released
1994-06-04 Perforation Treatment Performed - Jet Perforation
1994-06-04 Well Log Performed
1994-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-05 Perforation Treatment Performed - Jet Perforation
1994-06-05 Plug Back Performed
1994-06-05 Well Log Performed
1994-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-06 Plug Back Performed
1994-06-06 Well Log Performed
1994-09-06 Perforation Treatment Performed - Jet Perforation
1994-11-01 Well Began Production
1994-11-01 Well Fluid changed to Gas
1994-11-01 Well Mode changed to Flowing
2003-04-01 Well Fluid changed to Gas
2003-04-01 Well Mode changed to Pumping
2013-02-12 Well Fluid changed to Gas
2013-02-12 Well Mode changed to Suspended
2016-06-06 Well Fluid changed to Gas
2016-06-06 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-04 Perforation 1374.00 1375.00 13
1994-06-05 Packing Device Capped w/Cement 1355.00 1363.00 0
1994-06-05 Perforation 1025.00 1027.00 13
1994-06-06 Packing Device Capped w/Cement 1004.00 1012.00 0
1994-09-06 Perforation 876.00 879.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1238 0.0 0.0 0.0
1995 8597 0.0 0.0 0.0
1996 8587 0.0 0.0 0.0
1997 8471 0.0 0.0 0.0
1998 8610 0.0 0.0 0.0
1999 8705 0.0 0.0 0.0
2000 8598 0.0 0.0 0.0
2001 8728 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8664 0.0 0.0 0.0
2004 8651 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8687 0.0 0.0 0.0
2007 8663 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 7151 0.0 0.0 0.0
2010 7646 0.0 0.0 0.0
2011 8747 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 1036 0.0 0.0 0.0
2016 4906 0.0 0.0 0.0
2017 8675 0.0 0.0 0.0
2018 8371 0.0 0.0 0.0
2019 8615 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References