X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154162310003

Well Details

Well ID: 0154162310003
Loading map...
Location: 00/10-23-015-16W4/3
Location Alias: 00/10-23-15-16 W4M
Location Alias 2: 00/10-23-015-16 W4/03
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 16
Section: 23
County/Municipality: Municipal District of Taber
Well Name: CNRL ENCHANT 10-23-15-16
Operator Name: Canadian Natural Resources Limited
License Number: 0274288
License Date: 2002-10-01
License Status: Suspension
Spud Date: 2002-10-07
Final Drill Date: 2002-10-11
Well Total Depth: 1095.00 m
Surface Hole Latitude: 50.274897
Surface Hole Longitude: -112.101698

For data sources see[1][2]

Well History

Date Event
2002-10-01 Obtained License
2002-10-08 Direction Drilling Operation Performed - Deviate
2002-10-08 Surface Casing Operation Performed
2002-10-11 Finished Drilling
2002-10-11 Well Log Performed
2002-10-11 Well Mode changed to Drilled and Cased
2002-10-12 Drill Stem Test Performed
2002-10-13 Drill Stem Test Performed
2002-10-13 Production Casing Operation Performed
2002-10-14 Rig Released
2002-10-18 Perforation Treatment Performed - Jet Perforation
2002-10-18 Well Log Performed
2003-05-30 Well Log Performed
2003-05-31 Perforation Treatment Performed - Cement Squeeze
2003-05-31 Plug Back Performed
2003-06-04 Perforation Treatment Performed - Jet Perforation
2003-06-04 Well Log Performed
2003-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-11 Well Began Production
2003-06-11 Well Fluid changed to Crude Oil
2003-06-11 Well Mode changed to Pumping
2018-12-31 Well Fluid changed to Crude Oil
2018-12-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-10-08 280.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-18 Perforation 1023.00 1025.00 17
2002-10-18 Perforation 841.00 842.00 17
2003-05-31 Cement Squeeze 1023.00 1025.00 0
2003-05-31 Cement Squeeze 841.00 842.00 0
2003-06-04 Perforation 1068.00 1073.50 17
2003-06-05 Acid Treatment 1068.00 1073.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4551 0.0 0.0 0.0
2004 8216 0.0 0.0 0.0
2005 7086 0.0 0.0 0.0
2006 8639 0.0 0.0 0.0
2007 8126 0.0 0.0 0.0
2008 8337 0.0 0.0 0.0
2009 4254 0.0 0.0 0.0
2010 7901 0.0 0.0 0.0
2011 8299 0.0 0.0 0.0
2012 8678 0.0 0.0 0.0
2013 7229 0.0 0.0 0.0
2014 8760 0.0 0.0 0.0
2015 8304 0.0 0.0 0.0
2016 8701 0.0 0.0 0.0
2017 8408 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0

For data sources see[6]

References