X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154162906000

Well Details

Well ID: 0154162906000
Loading map...
Location: 00/06-29-015-16W4/0
Location Alias: 00/06-29-15-16 W4M
Location Alias 2: 00/06-29-015-16 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 16
Section: 29
County/Municipality: Municipal District of Taber
Well Name: NORCEN ET AL ENCHANT 6-29-15-16
Operator Name: Canadian Natural Resources Limited
License Number: 0053488
License Date: 1975-04-25
License Status: Abandoned
Spud Date: 1975-05-30
Final Drill Date: 1975-06-05
Well Total Depth: 1057.00 m
Surface Hole Latitude: 50.287283
Surface Hole Longitude: -112.173760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-04-25 Obtained License
1975-06-05 Finished Drilling
1975-06-07 Drill Stem Test Performed
1975-06-08 Production Casing Operation Performed
1975-11-21 Perforation Treatment Performed - Jet Perforation
1976-01-30 Well Mode changed to Drilled and Cased
1978-02-01 Well Began Production
1978-02-01 Well Fluid changed to Gas
1978-02-01 Well Mode changed to Flowing
1983-04-28 Perforation Treatment Performed - Jet Perforation
1983-05-01 Well Fluid changed to Gas
1983-05-01 Well Mode changed to Suspended
1996-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-30 Plug Back Performed
1996-07-31 Perforation Treatment Performed - Jet Perforation
1996-07-31 Perforation Treatment Performed - Remedial Casing
1996-08-16 Perforation Treatment Performed - Jet Perforation
1996-08-17 Perforation Treatment Performed - Remedial Casing
1996-09-18 Perforation Treatment Performed - Jet Perforation
1996-09-18 Perforation Treatment Performed - Remedial Casing
1996-09-19 Well Abandoned
1996-09-19 Well Fluid changed to Gas
1996-09-19 Well Mode changed to Abandoned Zone
2003-03-02 Perforation Treatment Performed - Jet Perforation
2003-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-04 Plug Back Performed
2003-03-05 Perforation Treatment Performed - Cement Plug
2003-03-05 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-21 Perforation 1027.20 1027.80 7
1996-09-18 Perforation 124.40 125.40 13
1996-09-18 Remedial Casing Cementing 124.40 125.40 0
2003-03-02 Perforation 1000.40 1001.90 13
2003-03-04 Packing Device Capped w/Cement 1005.00 1013.00 0
2003-03-04 Packing Device Capped w/Cement 981.00 989.00 0
2003-03-05 Cement Plug 250.00 305.00 0
2003-03-05 Cement Plug 155.00 220.00 0
2003-03-05 Cement Plug 75.00 135.00 0
1975-11-21 Perforation 1028.70 1029.90 7
1975-11-21 Perforation 1031.40 1032.10 7
1983-04-28 Perforation 1000.40 1001.90 13
1996-07-30 Packing Device Capped w/Cement 982.00 990.00 0
1996-07-31 Perforation 292.00 293.00 13
1996-07-31 Remedial Casing Cementing 292.00 293.00 0
1996-08-16 Perforation 216.00 217.00 13
1996-08-17 Remedial Casing Cementing 216.00 217.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 365 0.0 0.0 0.0
1977 5928 0.0 0.0 0.0
1978 6480 0.0 0.0 0.0
1979 6599 0.0 0.0 0.0
1980 4953 0.0 0.0 0.0
1981 3404 0.0 0.0 0.0
1982 4527 0.0 0.0 0.0
1983 1036 0.0 0.0 0.0

For data sources see[5]

References