X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154180607030

Well Details

Well ID: 0154180607030
Loading map...
Location: 03/07-06-015-18W4/0
Location Alias: 03/07-06-15-18 W4M
Location Alias 2: 03/07-06-015-18 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 18
Section: 06
County/Municipality: Municipal District of Taber
Well Name: TERRAQUEST 103 HZ LBOW 7-6-15-18
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0155521
License Date: 1993-01-07
License Status: Issued
Spud Date: 1993-01-23
Final Drill Date: 1993-02-03
Well Total Depth: 1520.00 m
Surface Hole Latitude: 50.231059
Surface Hole Longitude: -112.458521

For data sources see[1][2]

Well History

Date Event
1993-01-07 Obtained License
1993-01-24 Surface Casing Operation Performed
1993-01-26 Direction Drilling Operation Performed - Horizontal
1993-02-03 Finished Drilling
1993-02-03 Well Log Performed
1993-02-03 Well Mode changed to Drilled and Cased
1993-02-07 Production Casing Operation Performed
1993-02-07 Rig Released
1993-02-18 Perforation Treatment Performed - Open-Hole Completion
1993-02-20 Well Log Performed
1993-02-21 Perforation Treatment Performed - Jet Perforation
1993-02-21 Perforation Treatment Performed - Remedial Casing
1993-02-21 Well Log Performed
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
2009-03-07 Perforation Treatment Performed - Jet Perforation
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Mode changed to Suspended
2016-10-14 Well Fluid changed to Crude Oil
2016-10-14 Well Mode changed to Pumping
2018-02-19 Well Fluid changed to Crude Oil
2018-02-19 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-01-26 899.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-18 Open Hole/Barefoot Completion 1384.00 1520.00 0
1993-02-21 Perforation 224.00 225.00 4
1993-02-21 Remedial Casing Cementing 224.00 225.00 0
2009-03-07 Perforation 1357.00 1363.00 17
2009-03-07 Perforation 1368.00 1378.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5822 0.0 0.0 0.0
1994 8657 0.0 0.0 0.0
1995 8365 0.0 0.0 0.0
1996 8677 0.0 0.0 0.0
1997 8335 0.0 0.0 0.0
1998 8538 0.0 0.0 0.0
1999 8385 0.0 0.0 0.0
2000 8511 0.0 0.0 0.0
2001 8636 0.0 0.0 0.0
2002 3682 0.0 0.0 0.0
2003 7604 0.0 0.0 0.0
2004 8304 0.0 0.0 0.0
2005 8516 0.0 0.0 0.0
2006 8506 0.0 0.0 0.0
2007 7945 0.0 0.0 0.0
2008 7122 0.0 0.0 0.0
2009 6217 0.0 0.0 0.0
2010 5058 0.0 0.0 0.0
2016 991 0.0 0.0 0.0
2017 4411 0.0 0.0 0.0

For data sources see[6]

References