X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154180906000

Well Details

Well ID: 0154180906000
Loading map...
Location: 00/06-09-015-18W4/0
Location Alias: 00/06-09-15-18 W4M
Location Alias 2: 00/06-09-015-18 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 18
Section: 09
County/Municipality: Municipal District of Taber
Well Name: NORCENPL LITTLE BOW 6-9-15-18
Operator Name: Canadian Slovenia Oil & Gas Ltd.
License Number: 0073270
License Date: 1978-12-01
License Status: RecCertified
Spud Date: 1979-04-14
Final Drill Date: 1979-04-19
Well Total Depth: 1157.00 m
Surface Hole Latitude: 50.241612
Surface Hole Longitude: -112.422324

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-01 Obtained License
1979-04-19 Finished Drilling
1979-04-19 Well Mode changed to Drilled and Cased
1979-04-20 Drill Stem Test Performed
1979-04-22 Drill Stem Test Performed
1979-04-23 Production Casing Operation Performed
1979-04-29 Perforation Treatment Performed - Jet Perforation
1979-05-03 Well Began Production
1979-05-03 Well Fluid changed to Crude Oil
1979-05-03 Well Mode changed to Flowing
1984-01-23 Well Fluid changed to Crude Oil
1984-01-23 Well Mode changed to Suspended
1987-01-01 Well Fluid changed to Crude Oil
1987-01-01 Well Mode changed to Flowing
1987-03-14 Perforation Treatment Performed - Jet Perforation
1987-03-14 Well Log Performed
1989-09-27 Well Fluid changed to Crude Oil
1989-09-27 Well Mode changed to Suspended
1995-05-26 Well Fluid changed to Crude Oil
1995-05-26 Well Mode changed to Closed
1998-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-23 Plug Back Performed
1998-11-25 Perforation Treatment Performed - Jet Perforation
1998-11-25 Well Log Performed
1998-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-26 Perforation Treatment Performed - Remedial Casing
1998-11-27 Perforation Treatment Performed - Jet Perforation
1998-11-27 Well Log Performed
1998-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-28 Perforation Treatment Performed - Remedial Casing
1998-12-03 Well Abandoned
1998-12-03 Well Fluid changed to Crude Oil
1998-12-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-04-29 Perforation 1094.00 1097.00 7
1998-11-27 Perforation 201.00 201.70 13
1998-11-28 Acid Treatment 194.00 201.70 0
1998-11-28 Remedial Casing Cementing 194.00 201.70 0
1998-11-28 Packing Device Capped w/Cement 146.30 198.50 0
1987-03-14 Perforation 1094.30 1096.30 13
1998-11-23 Packing Device Capped w/Cement 1082.00 1090.00 0
1998-11-25 Perforation 228.60 228.90 13
1998-11-25 Perforation 236.00 236.70 13
1998-11-26 Acid Treatment 228.60 236.70 0
1998-11-26 Remedial Casing Cementing 228.60 236.70 0
1998-11-26 Packing Device Capped w/Cement 202.30 232.50 0
1998-11-27 Perforation 194.00 194.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 384 0.0 0.0 0.0
1980 3840 0.0 0.0 0.0
1981 8471 0.0 0.0 0.0
1982 6580 0.0 0.0 0.0
1987 6097 0.0 0.0 0.0
1988 6192 0.0 0.0 0.0
1989 5145 0.0 0.0 0.0

For data sources see[5]

References