X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164170604000

Well Details

Well ID: 0164170604000
Loading map...
Location: 00/04-06-016-17W4/0
Location Alias: 00/04-06-16-17 W4M
Location Alias 2: 00/04-06-016-17 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 17
Section: 06
County/Municipality: Municipal District of Taber
Well Name: CNRL ENCHANT 4-6-16-17
Operator Name: Canadian Natural Resources Limited
License Number: 0187208
License Date: 1996-04-15
License Status: Abandoned
Spud Date: 1996-05-07
Final Drill Date: 1996-05-11
Well Total Depth: 1170.00 m
Surface Hole Latitude: 50.308316
Surface Hole Longitude: -112.340490

For data sources see[1][2]

Well History

Date Event
1996-04-15 Obtained License
1996-05-08 Direction Drilling Operation Performed - Deviate
1996-05-08 Surface Casing Operation Performed
1996-05-11 Finished Drilling
1996-05-11 Well Log Performed
1996-05-11 Well Mode changed to Drilled and Cased
1996-05-12 Production Casing Operation Performed
1996-05-12 Rig Released
1996-05-21 Perforation Treatment Performed - Jet Perforation
1996-05-23 Perforation Treatment Performed - Fractured
1996-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-27 Perforation Treatment Performed - Jet Perforation
1996-05-27 Plug Back Performed
1996-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-28 Plug Back Performed
1996-05-28 Well Mode changed to Abandoned Zone
1996-06-20 Well Log Performed
2010-12-02 Perforation Treatment Performed - Jet Perforation
2010-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-10 Perforation Treatment Performed - Cement Squeeze
2010-12-10 Perforation Treatment Performed - Jet Perforation
2010-12-10 Plug Back Performed
2010-12-10 Well Log Performed
2010-12-14 Perforation Treatment Performed - Remedial Casing
2010-12-15 Perforation Treatment Performed - Cement Squeeze
2010-12-15 Plug Back Performed
2010-12-18 Well Log Performed
2011-01-08 Perforation Treatment Performed - Jet Perforation
2011-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-18 Well Log Performed
2011-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-21 Perforation Treatment Performed - Remedial Casing
2011-03-11 Perforation Treatment Performed - Jet Perforation
2011-03-11 Well Log Performed
2011-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-13 Perforation Treatment Performed - Jet Perforation
2011-03-15 Perforation Treatment Performed - Jet Perforation
2011-03-15 Well Log Performed
2011-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-17 Perforation Treatment Performed - Remedial Casing
2011-03-18 Perforation Treatment Performed - Jet Perforation
2011-03-18 Well Log Performed
2011-03-21 Perforation Treatment Performed - Jet Perforation
2011-03-21 Well Log Performed
2011-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-05 Perforation Treatment Performed - Remedial Casing
2011-05-07 Well Log Performed
2011-05-11 Perforation Treatment Performed - Jet Perforation
2011-05-11 Well Log Performed
2011-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-12 Perforation Treatment Performed - Remedial Casing
2011-05-17 Perforation Treatment Performed - Jet Perforation
2011-05-20 Perforation Treatment Performed - Jet Perforation
2011-05-20 Well Log Performed
2011-05-21 Perforation Treatment Performed - Jet Perforation
2011-05-21 Well Log Performed
2011-05-23 Perforation Treatment Performed - Remedial Casing
2011-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-03 Well Abandoned
2011-08-03 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-05-08 300.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-05-21 Perforation 1100.00 1105.00 13
2010-12-10 Packing Device Capped w/Cement 1085.00 1098.00 0
2010-12-10 Perforation 845.00 848.00 20
2010-12-14 Remedial Casing Cementing 845.00 848.00 0
2010-12-15 Cement Squeeze 325.00 331.00 0
2011-01-08 Perforation 846.00 849.00 20
2011-01-08 Perforation 844.00 847.00 20
2011-01-15 Acid Treatment 844.00 849.00 0
2011-01-21 Remedial Casing Cementing 844.00 849.00 0
2011-01-21 Packing Device Capped w/Cement 833.00 841.00 0
2011-03-11 Perforation 364.00 367.00 17
1996-05-23 Fracture 1100.00 1105.00 0
2011-03-13 Perforation 362.00 365.00 17
2011-03-13 Acid Treatment 362.00 365.00 0
2011-03-15 Perforation 325.00 328.00 20
2011-03-15 Perforation 325.00 327.00 17
2011-03-15 Perforation 324.00 325.00 17
2011-03-15 Perforation 326.60 327.50 99
2011-03-16 Acid Treatment 324.00 328.00 0
2011-03-16 Packing Device Capped w/Cement 349.00 359.00 0
2011-03-17 Remedial Casing Cementing 324.00 328.00 0
2011-03-17 Packing Device Capped w/Cement 310.00 319.10 0
1996-05-27 Packing Device Capped w/Cement 1086.00 1094.00 0
2011-03-18 Perforation 263.00 266.00 20
2011-03-18 Perforation 263.00 266.00 17
2011-03-21 Perforation 265.10 266.00 99
2011-03-21 Perforation 263.00 263.90 99
2011-05-05 Remedial Casing Cementing 263.00 266.00 0
2011-05-05 Packing Device Capped w/Cement 246.10 256.10 0
2011-05-11 Perforation 54.00 55.00 17
2011-05-12 Remedial Casing Cementing 54.00 55.00 0
2011-05-12 Packing Device Capped w/Cement 49.00 51.80 0
2011-05-17 Perforation 54.00 55.00 17
1996-05-27 Perforation 325.00 326.00 13
2011-05-20 Perforation 54.00 56.00 17
2011-05-20 Perforation 54.00 55.00 17
2011-05-21 Perforation 52.00 54.00 17
2011-05-23 Remedial Casing Cementing 52.00 56.00 0
2011-05-24 Packing Device Capped w/Cement 40.10 50.10 0
1996-05-27 Perforation 327.00 331.00 13
1996-05-28 Packing Device Capped w/Cement 312.00 320.00 0
2010-12-02 Perforation 325.00 331.00 13
2010-12-02 Perforation 1100.00 1105.00 13
2010-12-10 Cement Squeeze 1100.00 1105.00 0

For data sources see[5]



References