If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164170604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.308316,"lon":-112.34049,"icon":""}]} |
Location: 00/04-06-016-17W4/0 | |
Location Alias: 00/04-06-16-17 W4M | |
Location Alias 2: 00/04-06-016-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 17 | |
Section: 06 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL ENCHANT 4-6-16-17 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0187208 | |
License Date: 1996-04-15 | |
License Status: Abandoned | |
Spud Date: 1996-05-07 | |
Final Drill Date: 1996-05-11 | |
Well Total Depth: 1170.00 m | |
Surface Hole Latitude: 50.308316 | |
Surface Hole Longitude: -112.340490 |
Date | Event |
---|---|
1996-04-15 | Obtained License |
1996-05-08 | Direction Drilling Operation Performed - Deviate |
1996-05-08 | Surface Casing Operation Performed |
1996-05-11 | Finished Drilling |
1996-05-11 | Well Log Performed |
1996-05-11 | Well Mode changed to Drilled and Cased |
1996-05-12 | Production Casing Operation Performed |
1996-05-12 | Rig Released |
1996-05-21 | Perforation Treatment Performed - Jet Perforation |
1996-05-23 | Perforation Treatment Performed - Fractured |
1996-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-27 | Perforation Treatment Performed - Jet Perforation |
1996-05-27 | Plug Back Performed |
1996-05-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-28 | Plug Back Performed |
1996-05-28 | Well Mode changed to Abandoned Zone |
1996-06-20 | Well Log Performed |
2010-12-02 | Perforation Treatment Performed - Jet Perforation |
2010-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-12-10 | Perforation Treatment Performed - Cement Squeeze |
2010-12-10 | Perforation Treatment Performed - Jet Perforation |
2010-12-10 | Plug Back Performed |
2010-12-10 | Well Log Performed |
2010-12-14 | Perforation Treatment Performed - Remedial Casing |
2010-12-15 | Perforation Treatment Performed - Cement Squeeze |
2010-12-15 | Plug Back Performed |
2010-12-18 | Well Log Performed |
2011-01-08 | Perforation Treatment Performed - Jet Perforation |
2011-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-01-18 | Well Log Performed |
2011-01-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-21 | Perforation Treatment Performed - Remedial Casing |
2011-03-11 | Perforation Treatment Performed - Jet Perforation |
2011-03-11 | Well Log Performed |
2011-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-03-13 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Well Log Performed |
2011-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-17 | Perforation Treatment Performed - Remedial Casing |
2011-03-18 | Perforation Treatment Performed - Jet Perforation |
2011-03-18 | Well Log Performed |
2011-03-21 | Perforation Treatment Performed - Jet Perforation |
2011-03-21 | Well Log Performed |
2011-05-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-05-05 | Perforation Treatment Performed - Remedial Casing |
2011-05-07 | Well Log Performed |
2011-05-11 | Perforation Treatment Performed - Jet Perforation |
2011-05-11 | Well Log Performed |
2011-05-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-05-12 | Perforation Treatment Performed - Remedial Casing |
2011-05-17 | Perforation Treatment Performed - Jet Perforation |
2011-05-20 | Perforation Treatment Performed - Jet Perforation |
2011-05-20 | Well Log Performed |
2011-05-21 | Perforation Treatment Performed - Jet Perforation |
2011-05-21 | Well Log Performed |
2011-05-23 | Perforation Treatment Performed - Remedial Casing |
2011-05-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-03 | Well Abandoned |
2011-08-03 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-05-08 | 300.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-05-21 | Perforation | 1100.00 | 1105.00 | 13 |
2010-12-10 | Packing Device Capped w/Cement | 1085.00 | 1098.00 | 0 |
2010-12-10 | Perforation | 845.00 | 848.00 | 20 |
2010-12-14 | Remedial Casing Cementing | 845.00 | 848.00 | 0 |
2010-12-15 | Cement Squeeze | 325.00 | 331.00 | 0 |
2011-01-08 | Perforation | 846.00 | 849.00 | 20 |
2011-01-08 | Perforation | 844.00 | 847.00 | 20 |
2011-01-15 | Acid Treatment | 844.00 | 849.00 | 0 |
2011-01-21 | Remedial Casing Cementing | 844.00 | 849.00 | 0 |
2011-01-21 | Packing Device Capped w/Cement | 833.00 | 841.00 | 0 |
2011-03-11 | Perforation | 364.00 | 367.00 | 17 |
1996-05-23 | Fracture | 1100.00 | 1105.00 | 0 |
2011-03-13 | Perforation | 362.00 | 365.00 | 17 |
2011-03-13 | Acid Treatment | 362.00 | 365.00 | 0 |
2011-03-15 | Perforation | 325.00 | 328.00 | 20 |
2011-03-15 | Perforation | 325.00 | 327.00 | 17 |
2011-03-15 | Perforation | 324.00 | 325.00 | 17 |
2011-03-15 | Perforation | 326.60 | 327.50 | 99 |
2011-03-16 | Acid Treatment | 324.00 | 328.00 | 0 |
2011-03-16 | Packing Device Capped w/Cement | 349.00 | 359.00 | 0 |
2011-03-17 | Remedial Casing Cementing | 324.00 | 328.00 | 0 |
2011-03-17 | Packing Device Capped w/Cement | 310.00 | 319.10 | 0 |
1996-05-27 | Packing Device Capped w/Cement | 1086.00 | 1094.00 | 0 |
2011-03-18 | Perforation | 263.00 | 266.00 | 20 |
2011-03-18 | Perforation | 263.00 | 266.00 | 17 |
2011-03-21 | Perforation | 265.10 | 266.00 | 99 |
2011-03-21 | Perforation | 263.00 | 263.90 | 99 |
2011-05-05 | Remedial Casing Cementing | 263.00 | 266.00 | 0 |
2011-05-05 | Packing Device Capped w/Cement | 246.10 | 256.10 | 0 |
2011-05-11 | Perforation | 54.00 | 55.00 | 17 |
2011-05-12 | Remedial Casing Cementing | 54.00 | 55.00 | 0 |
2011-05-12 | Packing Device Capped w/Cement | 49.00 | 51.80 | 0 |
2011-05-17 | Perforation | 54.00 | 55.00 | 17 |
1996-05-27 | Perforation | 325.00 | 326.00 | 13 |
2011-05-20 | Perforation | 54.00 | 56.00 | 17 |
2011-05-20 | Perforation | 54.00 | 55.00 | 17 |
2011-05-21 | Perforation | 52.00 | 54.00 | 17 |
2011-05-23 | Remedial Casing Cementing | 52.00 | 56.00 | 0 |
2011-05-24 | Packing Device Capped w/Cement | 40.10 | 50.10 | 0 |
1996-05-27 | Perforation | 327.00 | 331.00 | 13 |
1996-05-28 | Packing Device Capped w/Cement | 312.00 | 320.00 | 0 |
2010-12-02 | Perforation | 325.00 | 331.00 | 13 |
2010-12-02 | Perforation | 1100.00 | 1105.00 | 13 |
2010-12-10 | Cement Squeeze | 1100.00 | 1105.00 | 0 |
For data sources see[5]