X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174122912002

Well Details

Well ID: 0174122912002
Loading map...
Location: 00/12-29-017-12W4/2
Location Alias: 00/12-29-17-12 W4M
Location Alias 2: 00/12-29-017-12 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 12
Section: 29
County/Municipality: County of Newell
Well Name: CALSTAN CPR BANTRY 12-29-17-12
Operator Name: Chevron Canada Limited
License Number: 0017459
License Date: 1959-07-22
License Status: RecCertified
Spud Date: 1959-07-23
Final Drill Date: 1959-07-27
Well Total Depth: 997.30 m
Surface Hole Latitude: 50.464742
Surface Hole Longitude: -111.628293

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-07-22 Obtained License
1959-07-27 Finished Drilling
1959-07-27 Well Mode changed to Drilled and Cased
1959-07-28 Drill Stem Test Performed
1959-07-29 Production Casing Operation Performed
1959-07-31 Perforation Treatment Performed - Jet Perforation
1959-09-18 Perforation Treatment Performed - Jet Perforation
1967-11-23 Perforation Treatment Performed - Cement Plug
1971-06-29 Perforation Treatment Performed - Jet Perforation
1971-12-02 Well Began Production
1971-12-02 Well Fluid changed to Gas
1971-12-02 Well Mode changed to Flowing
1976-04-01 Well Fluid changed to Gas
1976-04-01 Well Mode changed to Suspended
1979-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-10 Perforation Treatment Performed - Cement Squeeze
1979-10-10 Perforation Treatment Performed - Jet Perforation
1979-10-11 Perforation Treatment Performed - Cement Squeeze
1979-10-11 Perforation Treatment Performed - Jet Perforation
1979-10-11 Well Abandoned
1979-10-11 Well Fluid changed to Gas
1979-10-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-31 Perforation 980.20 981.50 13
1979-10-10 Cement Squeeze 403.90 404.50 0
1979-10-10 Perforation 274.30 274.90 13
1979-10-11 Cement Squeeze 274.30 274.90 0
1979-10-11 Perforation 158.50 159.10 13
1979-10-11 Cement Squeeze 158.50 159.10 0
1959-09-18 Perforation 978.70 979.30 13
1967-11-23 Cement Plug 942.10 988.20 0
1971-06-29 Perforation 793.70 795.50 7
1971-06-29 Perforation 796.10 796.70 7
1979-10-09 Packing Device Capped w/Cement 766.20 774.20 0
1979-10-10 Perforation 481.60 482.20 13
1979-10-10 Cement Squeeze 481.60 482.20 0
1979-10-10 Perforation 403.90 404.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 1291 0.0 0.0 0.0
1972 6342 0.0 0.0 0.0
1973 6511 0.0 0.0 0.0
1974 7428 0.0 0.0 0.0
1975 7173 0.0 0.0 0.0
1976 2330 0.0 0.0 0.0

For data sources see[5]

References