X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174290509002

Well Details

Well ID: 0174290509002
Loading map...
Location: 00/09-05-017-29W4/2
Location Alias: 00/09-05-17-29 W4M
Location Alias 2: 00/09-05-017-29 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 29
Section: 05
County/Municipality: Foothills County
Well Name: MOBIL COMPTON HIGH RIVER 9-5-17-29
Operator Name: Bighorn Energy Corporation
License Number: 0233291
License Date: 2000-02-06
License Status: Issued
Spud Date: 2000-03-06
Final Drill Date: 2000-03-29
Well Total Depth: 2755.00 m
Surface Hole Latitude: 50.407583
Surface Hole Longitude: -113.947010

For data sources see[1][2]

Well History

Date Event
2000-02-06 Obtained License
2000-03-08 Surface Casing Operation Performed
2000-03-19 Direction Drilling Operation Performed - Deviate
2000-03-29 Finished Drilling
2000-03-29 Well Log Performed
2000-03-29 Well Mode changed to Drilled and Cased
2000-03-30 Well Log Performed
2000-03-31 Production Casing Operation Performed
2000-04-01 Rig Released
2000-05-14 Perforation Treatment Performed - Jet Perforation
2000-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-20 Plug Back Performed
2000-07-21 Perforation Treatment Performed - Jet Perforation
2000-07-21 Well Mode changed to Drilled and Cased
2000-07-22 Perforation Treatment Performed - Fractured
2000-12-08 Well Began Production
2000-12-08 Well Fluid changed to Gas
2000-12-08 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-19 2454.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-05-14 Perforation 2707.00 2710.80 17
2000-05-15 Acid Treatment 2707.00 2710.80 0
2000-07-14 Perforation 2723.00 2726.80 17
2000-07-20 Acid Treatment 2707.00 2726.80 0
2000-07-20 Packing Device Capped w/Cement 2692.00 2700.00 0
2000-07-21 Perforation 2667.00 2668.50 17
2000-07-21 Perforation 2673.00 2676.00 17
2000-07-22 Fracture 2667.00 2668.50 0
2000-07-22 Fracture 2673.00 2676.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 276 0.0 0.0 0.0
2001 7806 0.0 0.0 0.0
2002 7406 0.0 0.0 0.0
2003 7301 0.0 0.0 0.0
2004 8556 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8560 0.0 0.0 0.0
2007 6590 0.0 0.0 0.0
2008 8343 0.0 0.0 0.0
2009 8234 0.0 0.0 0.0
2010 8086 0.0 0.0 0.0
2011 8458 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8469 0.0 0.0 0.0
2014 6394 0.0 0.0 0.0
2015 1388 0.0 0.0 0.0
2016 978 0.0 0.0 0.0
2020 1030 0.0 0.0 0.0

For data sources see[6]

References