X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0175052513002

Well Details

Well ID: 0175052513002
Loading map...
Location: 00/13-25-017-05W5/2
Location Alias: 00/13-25-17-05 W5M
Location Alias 2: 00/13-25-017-05 W5/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 5
Range: 05
Section: 25
County/Municipality: Kananaskis Improvement District
Well Name: DELHI-SULLIVAN CREEK #1
Operator Name: Sulpetro Limited
License Number: 0000385
License Date: 1942-11-04
License Status: RecExempt
Spud Date: 1942-12-16
Final Drill Date: 1952-01-19
Well Total Depth: 1989.40 m
Surface Hole Latitude: 50.468176
Surface Hole Longitude: -114.571705

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1942-11-04 Obtained License
1951-10-01 Perforation Treatment Performed - Bullet Perforation
1951-10-01 Perforation Treatment Performed - Cement Squeeze
1952-01-19 Drill Stem Test Performed
1952-01-19 Finished Drilling
1952-01-19 Perforation Treatment Performed - Bullet Perforation
1952-01-20 Production Casing Operation Performed
1952-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-01-31 Perforation Treatment Performed - Bullet Perforation
1952-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-09-29 Perforation Treatment Performed - Cement Plug
1952-09-29 Well Abandoned
1952-09-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-01 Bullet Perforation 306.30 307.20 10
1952-01-31 Bullet Perforation 1732.80 1733.70 13
1952-01-31 Bullet Perforation 1734.90 1737.70 13
1952-01-31 Bullet Perforation 1739.20 1741.00 13
1952-01-31 Bullet Perforation 1745.60 1746.80 13
1952-01-31 Bullet Perforation 1748.30 1751.40 13
1952-01-31 Bullet Perforation 1752.90 1754.10 13
1952-01-31 Bullet Perforation 1786.70 1788.00 13
1952-02-01 Acid Treatment 1732.80 1788.00 0
1952-09-29 Cement Plug 1682.80 1798.30 0
1951-10-01 Cement Squeeze 306.30 307.20 0
1952-01-19 Bullet Perforation 1870.60 1872.40 13
1952-01-19 Bullet Perforation 1859.00 1860.80 13
1952-01-19 Bullet Perforation 1852.30 1854.10 13
1952-01-19 Bullet Perforation 1845.30 1847.10 13
1952-01-19 Bullet Perforation 1834.60 1836.40 13
1952-01-27 Acid Treatment 1834.60 1872.40 0
1952-01-31 Packing Device Capped w/Cement 1825.80 1825.80 0

For data sources see[4]



References