If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0184141516002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.526296,"lon":-111.838129,"icon":""}]} |
Location: 00/16-15-018-14W4/2 | |
Location Alias: 00/16-15-18-14 W4M | |
Location Alias 2: 00/16-15-018-14 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 018 | |
Meridian: 4 | |
Range: 14 | |
Section: 15 | |
County/Municipality: County of Newell | |
Well Name: GPNG NEWELL 16-15-18-14 | |
Operator Name: Prospect Oil & Gas Management Ltd. | |
License Number: 0066256 | |
License Date: 1977-10-20 | |
License Status: Issued | |
Spud Date: 1977-11-20 | |
Final Drill Date: 1977-11-21 | |
Well Total Depth: 502.90 m | |
Surface Hole Latitude: 50.526296 | |
Surface Hole Longitude: -111.838129 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-10-20 | Obtained License |
1977-11-21 | Finished Drilling |
1977-11-21 | Production Casing Operation Performed |
1977-11-29 | Perforation Treatment Performed - Jet Perforation |
1977-11-29 | Perforation Treatment Performed - Selective Jet Perforations |
1977-11-30 | Perforation Treatment Performed - Bullet Perforation |
1977-11-30 | Perforation Treatment Performed - Fractured |
1977-11-30 | Perforation Treatment Performed - Selective Bullet Perforations |
1977-12-01 | Perforation Treatment Performed - Fractured |
1978-06-20 | Well Mode changed to Drilled and Cased |
1980-01-03 | Well Began Production |
1980-01-03 | Well Fluid changed to Gas |
1980-01-03 | Well Mode changed to Flowing |
1981-09-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-11-29 | Perforation | 437.40 | 438.00 | 3 |
1977-11-29 | Perforation | 445.30 | 445.60 | 3 |
1977-11-29 | Selective Jet Perforations | 447.40 | 447.40 | 7 |
1977-11-29 | Selective Jet Perforations | 447.80 | 447.80 | 7 |
1977-11-29 | Selective Jet Perforations | 448.10 | 448.70 | 0 |
1977-11-29 | Selective Jet Perforations | 449.90 | 449.90 | 7 |
1977-11-29 | Selective Jet Perforations | 456.90 | 456.90 | 7 |
1977-11-29 | Selective Jet Perforations | 457.20 | 457.20 | 7 |
1977-11-29 | Perforation | 457.50 | 457.80 | 3 |
1977-11-29 | Selective Jet Perforations | 459.00 | 462.70 | 0 |
1977-11-29 | Perforation | 462.70 | 463.00 | 3 |
1977-11-29 | Perforation | 438.00 | 438.30 | 3 |
1977-11-29 | Perforation | 463.00 | 463.60 | 3 |
1977-11-29 | Perforation | 487.40 | 487.70 | 3 |
1977-11-30 | Fracture | 437.40 | 487.70 | 0 |
1977-11-30 | Selective Bullet Perforations | 313.30 | 316.40 | 0 |
1977-11-30 | Bullet Perforation | 315.50 | 315.80 | 3 |
1977-11-30 | Bullet Perforation | 319.10 | 319.40 | 3 |
1977-11-30 | Bullet Perforation | 322.50 | 322.80 | 3 |
1977-11-30 | Selective Bullet Perforations | 323.40 | 324.90 | 0 |
1977-11-30 | Selective Bullet Perforations | 326.40 | 337.40 | 0 |
1977-11-30 | Bullet Perforation | 335.00 | 335.30 | 3 |
1977-11-29 | Perforation | 438.30 | 438.60 | 3 |
1977-11-30 | Bullet Perforation | 335.90 | 336.20 | 3 |
1977-11-30 | Selective Bullet Perforations | 338.00 | 341.40 | 0 |
1977-11-30 | Selective Bullet Perforations | 346.30 | 357.20 | 0 |
1977-11-30 | Bullet Perforation | 346.90 | 347.50 | 3 |
1977-11-30 | Bullet Perforation | 358.40 | 358.70 | 3 |
1977-11-30 | Bullet Perforation | 359.40 | 359.70 | 3 |
1977-11-30 | Bullet Perforation | 360.30 | 360.60 | 3 |
1977-11-30 | Bullet Perforation | 361.20 | 361.50 | 3 |
1977-11-30 | Selective Bullet Perforations | 366.10 | 372.50 | 0 |
1977-11-30 | Selective Bullet Perforations | 377.00 | 382.50 | 0 |
1977-11-29 | Perforation | 438.60 | 438.90 | 3 |
1977-11-30 | Bullet Perforation | 377.60 | 378.60 | 3 |
1977-11-30 | Bullet Perforation | 379.20 | 379.50 | 3 |
1977-11-30 | Bullet Perforation | 381.30 | 381.60 | 3 |
1977-11-30 | Bullet Perforation | 383.10 | 383.40 | 3 |
1977-11-30 | Selective Bullet Perforations | 384.00 | 384.00 | 0 |
1977-12-01 | Fracture | 313.30 | 384.00 | 0 |
1977-11-29 | Perforation | 438.90 | 439.50 | 3 |
1977-11-29 | Selective Jet Perforations | 439.80 | 439.80 | 7 |
1977-11-29 | Selective Jet Perforations | 440.10 | 440.10 | 7 |
1977-11-29 | Selective Jet Perforations | 440.40 | 441.40 | 0 |
1977-11-29 | Selective Jet Perforations | 441.40 | 444.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 6511 | 0.0 | 0.0 | 0.0 |
1981 | 4348 | 0.0 | 0.0 | 0.0 |
For data sources see[5]