X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194013513000

Well Details

Well ID: 0194013513000
Loading map...
Location: 00/13-35-019-01W4/0
Location Alias: 00/13-35-19-01 W4M
Location Alias 2: 00/13-35-019-01 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 01
Section: 35
County/Municipality: Cypress County
Well Name: DEEM MEDHAT 13-35-19-1
Operator Name: Plains Midstream Canada ULC
License Number: 0078204
License Date: 1979-09-24
License Status: Issued
Spud Date: 1979-09-30
Final Drill Date: 1979-10-14
Well Total Depth: 959.00 m
Surface Hole Latitude: 50.656920
Surface Hole Longitude: -110.046140

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-24 Obtained License
1979-10-06 Blow Occurred
1979-10-14 Finished Drilling
1979-10-16 Production Casing Operation Performed
1979-11-03 Perforation Treatment Performed - Jet Perforation
1979-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-07 Perforation Treatment Performed - Jet Perforation
1979-11-08 Perforation Treatment Performed - Jet Perforation
1979-11-14 Well Log Performed
1979-11-21 Perforation Treatment Performed - Jet Perforation
1979-11-22 Well Mode changed to Drilled and Cased
1980-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-13 Well Began Production
1980-12-13 Well Fluid changed to Gas
1980-12-13 Well Mode changed to Flowing
1987-10-01 Well Fluid changed to Gas
1987-10-01 Well Mode changed to Suspended
1988-08-31 Perforation Treatment Performed - Jet Perforation
1988-09-01 Well Log Performed
1989-05-17 Well Log Performed
1989-08-30 Well Began Injection
1989-08-30 Well Fluid changed to Water
1989-08-30 Well Type changed to Disposal
1992-10-19 Well Log Performed
1993-04-05 Well Log Performed
1993-04-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-03 Perforation 895.50 897.50 13
1979-11-03 Perforation 902.50 904.50 13
1979-11-07 Packing Device Capped w/Cement 797.20 800.00 0
1979-11-07 Perforation 765.50 790.00 13
1979-11-08 Perforation 765.50 768.50 13
1979-11-21 Perforation 738.50 740.00 13
1980-08-13 Packing Device Capped w/Cement 750.00 750.00 0
1988-08-31 Perforation 765.50 790.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 280 0.0 0.0 0.0
1981 7567 0.0 0.0 0.0
1982 8054 0.0 0.0 0.0
1983 7827 0.0 0.0 0.0
1984 1405 0.0 0.0 0.0
1985 2320 0.0 0.0 0.0
1986 4899 0.0 0.0 0.0
1987 336 0.0 0.0 0.0
1988 72 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-10-06 Blow 845.00 845.00

For data sources see[6]

References