If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0194202906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.637443,"lon":-112.745396,"icon":""}]} |
Location: 00/06-29-019-20W4/0 | |
Location Alias: 00/06-29-19-20 W4M | |
Location Alias 2: 00/06-29-019-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 4 | |
Range: 20 | |
Section: 29 | |
County/Municipality: Vulcan County | |
Well Name: COHO ET AL PILLING 6-29-19-20 | |
Operator Name: Coho Resources Limited | |
License Number: 0092521 | |
License Date: 1981-10-01 | |
License Status: Re-Entered | |
Spud Date: 1981-10-14 | |
Final Drill Date: 1981-10-22 | |
Well Total Depth: 1431.00 m | |
Surface Hole Latitude: 50.637443 | |
Surface Hole Longitude: -112.745396 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-10-01 | Obtained License |
1981-10-22 | Finished Drilling |
1981-10-22 | Well Mode changed to Drilled and Cased |
1981-10-23 | Drill Stem Test Performed |
1981-10-27 | Production Casing Operation Performed |
1981-12-11 | Perforation Treatment Performed - Jet Perforation |
1981-12-16 | Perforation Treatment Performed - Fractured |
1982-02-12 | Well Began Production |
1982-02-12 | Well Fluid changed to Crude Oil |
1982-02-12 | Well Mode changed to Pumping |
1987-03-22 | Well Fluid changed to Crude Oil |
1987-03-22 | Well Mode changed to Suspended |
1988-04-23 | Well Log Performed |
1988-04-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-04-24 | Plug Back Performed |
1988-04-24 | Well Abandoned |
1988-04-24 | Well Fluid changed to Crude Oil |
1988-04-24 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-12-11 | Perforation | 1379.50 | 1381.50 | 7 |
1981-12-16 | Fracture | 1379.50 | 1381.50 | 0 |
1988-04-24 | Packing Device Capped w/Cement | 1367.00 | 1375.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 7677 | 0.0 | 0.0 | 0.0 |
1983 | 8054 | 0.0 | 0.0 | 0.0 |
1984 | 8590 | 0.0 | 0.0 | 0.0 |
1985 | 8602 | 0.0 | 0.0 | 0.0 |
1986 | 8433 | 0.0 | 0.0 | 0.0 |
1987 | 1882 | 0.0 | 0.0 | 0.0 |
For data sources see[5]