X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194221712002

Well Details

Well ID: 0194221712002
Loading map...
Location: 00/12-17-019-22W4/2
Location Alias: 00/12-17-19-22 W4M
Location Alias 2: 00/12-17-019-22 W4/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 22
Section: 17
County/Municipality: Vulcan County
Well Name: CITY OF MEDH MILO 12-17-19-22
Operator Name: Response Energy Corporation
License Number: 0316764
License Date: 2004-10-15
License Status: RecCertified
Spud Date: 2004-10-20
Final Drill Date: 2004-10-22
Well Total Depth: 1018.00 m
Surface Hole Latitude: 50.611170
Surface Hole Longitude: -113.022804

For data sources see[1][2]

Well History

Date Event
2004-10-15 Obtained License
2004-10-21 Surface Casing Operation Performed
2004-10-22 Finished Drilling
2004-10-22 Production Casing Operation Performed
2004-10-22 Rig Released
2004-10-22 Well Mode changed to Drilled and Cased
2004-11-10 Well Log Performed
2004-11-16 Perforation Treatment Performed - Jet Perforation
2004-11-17 Perforation Treatment Performed - Fractured
2004-11-21 Perforation Treatment Performed - Jet Perforation
2004-11-25 Perforation Treatment Performed - Fractured
2004-11-28 Perforation Treatment Performed - Jet Perforation
2004-11-29 Perforation Treatment Performed - Fractured
2007-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-05-31 Perforation Treatment Performed - Jet Perforation
2007-05-31 Plug Back Performed
2007-06-16 Perforation Treatment Performed - Fractured
2007-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-06-22 Plug Back Performed
2007-06-22 Well Abandoned
2007-06-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-16 Perforation 977.00 979.00 13
2007-05-31 Perforation 474.80 475.70 13
2007-05-31 Perforation 259.70 264.30 13
2007-05-31 Perforation 256.50 257.50 13
2007-05-31 Perforation 258.70 259.00 13
2007-06-16 Fracture 256.50 475.70 0
2007-06-22 Packing Device Capped w/Cement 457.00 465.00 0
2007-06-22 Packing Device Capped w/Cement 244.00 252.00 0
2004-11-17 Fracture 977.00 979.00 0
2004-11-21 Perforation 965.00 970.00 13
2004-11-25 Fracture 965.00 970.00 0
2004-11-28 Perforation 654.50 657.50 20
2004-11-29 Fracture 654.50 657.50 0
2007-05-31 Packing Device Capped w/Cement 944.00 952.00 0
2007-05-31 Packing Device Capped w/Cement 637.00 645.00 0
2007-05-31 Perforation 472.20 473.90 13

For data sources see[4]



References