X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194230601002

Well Details

Well ID: 0194230601002
Loading map...
Location: 00/01-06-019-23W4/2
Location Alias: 00/01-06-19-23 W4M
Location Alias 2: 00/01-06-019-23 W4/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 23
Section: 06
County/Municipality: Vulcan County
Well Name: CNRL MILO 1-6-19-23
Operator Name: Canadian Natural Resources Limited
License Number: 0418765
License Date: 2010-02-22
License Status: Suspension
Spud Date: 2010-03-01
Final Drill Date: 2010-03-06
Well Total Depth: 1825.00 m
Surface Hole Latitude: 50.577165
Surface Hole Longitude: -113.172253

For data sources see[1][2]

Well History

Date Event
2010-02-22 Obtained License
2010-03-02 Surface Casing Operation Performed
2010-03-03 Direction Drilling Operation Performed - Deviate
2010-03-06 Finished Drilling
2010-03-06 Well Mode changed to Drilled and Cased
2010-03-07 Well Log Performed
2010-03-08 Production Casing Operation Performed
2010-03-08 Rig Released
2010-05-25 Well Log Performed
2010-05-26 Perforation Treatment Performed - Jet Perforation
2010-06-03 Perforation Treatment Performed - Fractured
2010-06-26 Well Log Performed
2010-06-27 Perforation Treatment Performed - Jet Perforation
2010-06-28 Perforation Treatment Performed - Fractured
2010-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-05 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-07-06 Perforation Treatment Performed - Jet Perforation
2010-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-13 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-03 551.60 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-05-26 Perforation 1788.00 1793.50 17
2010-06-03 Fracture 1788.00 1793.50 0
2010-06-27 Perforation 1778.50 1780.50 17
2010-06-28 Fracture 1778.50 1780.50 0
2010-07-05 Packing Device Capped w/Cement 1769.50 1777.50 0
2010-07-05 Packing Dev Cpd w/Res-Gyp Cem 1784.00 1787.00 0
2010-07-06 Perforation 1762.00 1764.50 17
2010-07-13 Packing Device Capped w/Cement 1753.00 1761.00 0

For data sources see[5]



References