X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194232706000

Well Details

Well ID: 0194232706000
Loading map...
Location: 00/06-27-019-23W4/0
Location Alias: 00/06-27-19-23 W4M
Location Alias 2: 00/06-27-019-23 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 23
Section: 27
County/Municipality: Vulcan County
Well Name: AMOCO MILO 6-27-19-23
Operator Name: Cinabar Enterprises Ltd.
License Number: 0043123
License Date: 1972-07-28
License Status: Abandoned
Spud Date: 1972-07-30
Final Drill Date: 1972-08-13
Well Total Depth: 1837.90 m
Surface Hole Latitude: 50.634507
Surface Hole Longitude: -113.113790

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-07-28 Obtained License
1972-08-11 Drill Stem Test Performed
1972-08-13 Finished Drilling
1972-08-14 Drill Stem Test Performed
1972-08-16 Drill Stem Test Performed
1972-08-17 Production Casing Operation Performed
1972-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-12 Perforation Treatment Performed - Jet Perforation
1972-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-17 Perforation Treatment Performed - Jet Perforation
1973-03-15 Well Mode changed to Drilled and Cased
1988-03-22 Well Began Production
1988-03-22 Well Fluid changed to Gas
1988-03-22 Well Mode changed to Flowing
1991-11-13 Well Log Performed
1991-11-14 Perforation Treatment Performed - Jet Perforation
1993-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-24 Plug Back Performed
1993-07-25 Perforation Treatment Performed - Jet Perforation
1993-07-25 Perforation Treatment Performed - Remedial Casing
1993-07-25 Well Fluid changed to Gas
1993-07-25 Well Mode changed to Abandoned
1993-08-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-09-12 Perforation 1790.10 1791.00 7
1993-07-25 Remedial Casing Cementing 463.00 463.50 0
1972-09-12 Perforation 1793.10 1794.70 7
1972-09-12 Acid Treatment 1790.10 1794.70 0
1972-09-16 Packing Device Capped w/Cement 1521.30 1531.60 0
1972-09-17 Perforation 1497.80 1499.00 7
1972-09-17 Acid Treatment 1497.80 1499.00 0
1991-11-14 Perforation 1497.80 1498.80 13
1993-07-24 Packing Device Capped w/Cement 1474.00 1484.00 0
1993-07-25 Perforation 463.00 463.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6734 0.0 0.0 0.0
1989 7980 0.0 0.0 0.0
1990 8321 0.0 0.0 0.0
1991 3119 0.0 0.0 0.0

For data sources see[5]

References