X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194251408002

Well Details

Well ID: 0194251408002
Loading map...
Location: 00/08-14-019-25W4/2
Location Alias: 00/08-14-19-25 W4M
Location Alias 2: 00/08-14-019-25 W4/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 25
Section: 14
County/Municipality: Vulcan County
Well Name: JOURNEY HERRON 8-14-19-25
Operator Name: Journey Energy Inc.
License Number: 0109465
License Date: 1984-09-24
License Status: Issued
Spud Date: 1984-10-01
Final Drill Date: 1984-10-18
Well Total Depth: 1880.00 m
Surface Hole Latitude: 50.608328
Surface Hole Longitude: -113.352729

For data sources see[1][2]

Well History

Date Event
1984-09-24 Obtained License
1984-10-03 Surface Casing Operation Performed
1984-10-07 Direction Drilling Operation Performed - Deviate
1984-10-18 Finished Drilling
1984-10-19 Well Log Performed
1984-10-21 Drill Stem Test Performed
1984-10-22 Production Casing Operation Performed
1984-10-22 Rig Released
1984-11-13 Perforation Treatment Performed - Jet Perforation
1984-11-13 Well Log Performed
1984-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-20 Perforation Treatment Performed - Acid Wash - No Pressure
1984-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-01 Perforation Treatment Performed - Jet Perforation
1984-12-01 Plug Back Performed
1991-09-05 Perforation Treatment Performed - Jet Perforation
1991-09-05 Well Log Performed
1991-09-06 Perforation Treatment Performed - Jet Perforation
1991-09-07 Well Log Performed
1991-09-08 Perforation Treatment Performed - Jet Perforation
1991-09-12 Perforation Treatment Performed - Cement Squeeze
1991-09-13 Well Log Performed
1991-09-14 Perforation Treatment Performed - Jet Perforation
1991-09-14 Well Mode changed to Drilled and Cased
1991-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-22 Perforation Treatment Performed - Jet Perforation
1991-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-25 Well Mode changed to Drilled and Cased
1992-05-21 Well Log Performed
1993-11-04 Well Log Performed
1993-11-05 Perforation Treatment Performed - Abrasa-Jet Perforation
1993-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-10-07 1142.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-13 Perforation 1830.50 1834.00 13
1991-09-12 Cement Squeeze 1801.00 1808.00 0
1991-09-14 Perforation 1807.00 1808.00 7
1991-09-16 Acid Treatment 1807.00 1808.00 0
1991-09-22 Perforation 1814.50 1816.00 7
1991-09-22 Perforation 1817.00 1820.00 7
1991-09-22 Perforation 1830.50 1834.00 7
1991-09-23 Acid Treatment 1814.50 1834.00 0
1993-11-05 Hydra Jet Perforation 1831.00 1834.00 0
1993-11-07 Acid Treatment 1831.00 1834.00 0
1984-11-15 Acid Treatment 1830.50 1834.00 0
1984-11-20 Acid Wash 1830.50 1834.00 0
1984-12-01 Packing Device Capped w/Cement 1820.50 1828.50 0
1984-12-01 Perforation 1814.50 1816.00 13
1991-09-05 Perforation 1830.50 1834.00 13
1991-09-06 Perforation 1817.00 1820.00 7
1991-09-08 Perforation 1801.00 1802.00 7
1991-09-08 Perforation 1807.00 1808.00 7

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-11-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References