X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020504000

Well Details

Well ID: 0195020504000
Loading map...
Location: 00/04-05-019-02W5/0
Location Alias: 00/04-05-19-02 W5M
Location Alias 2: 00/04-05-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 05
County/Municipality: Foothills County
Well Name: CPEC ROY 40 TV 4-5-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000030
License Date: 1939-02-04
License Status: Amended
Spud Date: 1939-03-03
Final Drill Date: 1939-07-22
Well Total Depth: 2401.80 m
Surface Hole Latitude: 50.573931
Surface Hole Longitude: -114.252394

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-02-04 Obtained License
1939-07-08 Production Casing Operation Performed
1939-07-22 Finished Drilling
1939-07-22 Perforation Treatment Performed - Open-Hole Completion
1939-07-22 Well Mode changed to Drilled and Cased
1939-07-23 Well Began Production
1939-07-23 Well Fluid changed to Crude Oil
1939-07-23 Well Mode changed to Flowing
1939-07-24 Perforation Treatment Performed - Acid Wash - No Pressure
1939-08-17 Perforation Treatment Performed - Acid Wash - No Pressure
1962-08-15 Well Fluid changed to Crude Oil
1962-08-15 Well Mode changed to Pumping
1963-04-02 Well Fluid changed to Crude Oil
1963-04-02 Well Mode changed to Flowing
1973-02-14 Well Fluid changed to Crude Oil
1973-02-14 Well Mode changed to Pumping
1997-04-06 Well Log Performed
1997-04-09 Well Log Performed
2003-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-26 Plug Back Performed
2003-02-26 Well Fluid changed to Crude Oil
2003-02-26 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-07-22 Open Hole/Barefoot Completion 2300.30 2401.80 0
1939-07-24 Acid Wash 2300.30 2401.80 0
1939-08-17 Acid Wash 2300.30 2401.80 0
2003-02-26 Packing Device Capped w/Cement 2280.00 2387.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 126 0.0 0.0 0.0
1968 72 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 17 0.0 0.0 0.0
1971 47 0.0 0.0 0.0
1972 1761 0.0 0.0 0.0
1973 8085 0.0 0.0 0.0
1974 8709 0.0 0.0 0.0
1975 7617 0.0 0.0 0.0
1976 7779 0.0 0.0 0.0
1977 7433 0.0 0.0 0.0
1978 3842 0.0 0.0 0.0
1979 8663 0.0 0.0 0.0
1980 8619 0.0 0.0 0.0
1981 8566 0.0 0.0 0.0
1982 8552 0.0 0.0 0.0
1983 7170 0.0 0.0 0.0
1984 8747 0.0 0.0 0.0
1985 8613 0.0 0.0 0.0
1986 7329 0.0 0.0 0.0
1987 7971 0.0 0.0 0.0
1988 8184 0.0 0.0 0.0
1989 8268 0.0 0.0 0.0
1990 8390 0.0 0.0 0.0
1991 8488 0.0 0.0 0.0
1992 8525 0.0 0.0 0.0
1993 7937 0.0 0.0 0.0
1994 8595 0.0 0.0 0.0
1995 8581 0.0 0.0 0.0
1996 8509 0.0 0.0 0.0
1997 8244 0.0 0.0 0.0
1998 8176 0.0 0.0 0.0
1999 8589 0.0 0.0 0.0
2000 8576 0.0 0.0 0.0
2001 8109 0.0 0.0 0.0
2002 8441 0.0 0.0 0.0
2003 1073 0.0 0.0 0.0

For data sources see[5]

References