X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204071908000

Well Details

Well ID: 0204071908000
Loading map...
Location: 00/08-19-020-07W4/0
Location Alias: 00/08-19-20-07 W4M
Location Alias 2: 00/08-19-020-07 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 07
Section: 19
County/Municipality: Special Areas No. 2
Well Name: CRESTAR 100 HZ SUFFIELD 8-19-20-7
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0236571
License Date: 2000-04-27
License Status: RecCertified
Spud Date: 2000-05-01
Final Drill Date: 2000-05-06
Well Total Depth: 1310.00 m
Surface Hole Latitude: 50.712099
Surface Hole Longitude: -110.952185

For data sources see[1][2]

Well History

Date Event
2000-04-27 Obtained License
2000-05-02 Surface Casing Operation Performed
2000-05-03 Direction Drilling Operation Performed - Horizontal
2000-05-04 Well Log Performed
2000-05-05 Intermediate Casing Operation Performed
2000-05-06 Finished Drilling
2000-05-06 Liner Casing Operation Performed
2000-05-06 Perforation Treatment Performed - Open-Hole Completion
2000-05-06 Perforation Treatment Performed - Slotted Liner or Casing
2000-05-06 Well Log Performed
2000-05-07 Rig Released
2000-05-07 Well Mode changed to Drilled and Cased
2000-05-11 Well Began Production
2000-05-11 Well Fluid changed to Crude Oil
2000-05-11 Well Mode changed to Pumping
2002-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-07 Plug Back Performed
2002-06-07 Well Fluid changed to Crude Oil
2002-06-07 Well Mode changed to Abandoned Zone
2002-06-13 Well Abandoned
2002-06-13 Well Fluid changed to Crude Oil
2002-06-13 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-05-03 750.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-05-06 Slotted Liner 1104.00 1271.30 0
2000-05-06 Open Hole/Barefoot Completion 1271.30 1310.00 0
2002-06-07 Packing Device Capped w/Cement 970.00 1008.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3586 0.0 0.0 0.0

For data sources see[6]

References