If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0204072112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.712014,"lon":-110.922785,"icon":""}]} |
| Location: 00/12-21-020-07W4/0 | |
| Location Alias: 00/12-21-20-07 W4M | |
| Location Alias 2: 00/12-21-020-07 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 020 | |
| Meridian: 4 | |
| Range: 07 | |
| Section: 21 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: LEGEND ENERGY SUFFIELD 12-21-20-7 | |
| Operator Name: Legend Energy Canada Ltd. | |
| License Number: 0144563 | |
| License Date: 1990-06-22 | |
| License Status: Abandoned | |
| Spud Date: 1990-07-09 | |
| Final Drill Date: 1990-07-11 | |
| Well Total Depth: 1000.00 m | |
| Surface Hole Latitude: 50.712014 | |
| Surface Hole Longitude: -110.922785 |
| Date | Event |
|---|---|
| 1990-06-22 | Obtained License |
| 1990-07-10 | Surface Casing Operation Performed |
| 1990-07-11 | Finished Drilling |
| 1990-07-11 | Well Mode changed to Drilled and Cased |
| 1990-07-12 | Drill Stem Test Performed |
| 1990-07-12 | Well Log Performed |
| 1990-07-13 | Production Casing Operation Performed |
| 1990-07-13 | Rig Released |
| 1990-07-28 | Perforation Treatment Performed - Jet Perforation |
| 1990-07-30 | Perforation Treatment Performed - Jet Perforation |
| 1990-11-05 | Perforation Treatment Performed - Cement Squeeze |
| 1990-11-05 | Plug Back Performed |
| 1990-11-08 | Perforation Treatment Performed - Jet Perforation |
| 1990-11-27 | Well Began Production |
| 1990-11-27 | Well Fluid changed to Crude Oil |
| 1990-11-27 | Well Mode changed to Pumping |
| 1991-09-01 | Well Fluid changed to Crude Oil |
| 1991-09-01 | Well Mode changed to Suspended |
| 1992-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-06-09 | Plug Back Performed |
| 1992-06-09 | Well Abandoned |
| 1992-06-09 | Well Fluid changed to Crude Oil |
| 1992-06-09 | Well Mode changed to Abandoned |
| 1998-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-11-05 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-07-28 | Perforation | 968.50 | 972.00 | 13 |
| 1990-07-30 | Perforation | 784.00 | 785.00 | 13 |
| 1990-11-05 | Cement Squeeze | 784.00 | 785.00 | 0 |
| 1990-11-08 | Perforation | 968.50 | 972.00 | 13 |
| 1990-11-08 | Perforation | 974.00 | 975.00 | 13 |
| 1990-11-08 | Perforation | 975.50 | 976.50 | 13 |
| 1992-06-09 | Packing Device Capped w/Cement | 955.00 | 963.00 | 0 |
| 1998-11-05 | Packing Device Capped w/Cement | 770.00 | 778.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 811 | 0.0 | 0.0 | 0.0 |
| 1991 | 1589 | 0.0 | 0.0 | 0.0 |
For data sources see[5]