If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204083003023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.719167,"lon":-111.100989,"icon":""}]} |
Location: 02/03-30-020-08W4/3 | |
Location Alias: 02/03-30-20-08 W4M | |
Location Alias 2: 02/03-30-020-08 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 30 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL JENNER 3-30-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0204856 | |
License Date: 1997-08-12 | |
License Status: Abandoned | |
Spud Date: 1997-09-08 | |
Final Drill Date: 1997-09-19 | |
Well Total Depth: 1138.00 m | |
Surface Hole Latitude: 50.719167 | |
Surface Hole Longitude: -111.100989 |
Date | Event |
---|---|
1997-08-12 | Obtained License |
1997-09-09 | Surface Casing Operation Performed |
1997-09-11 | Direction Drilling Operation Performed - Horizontal |
1997-09-17 | Production Casing Operation Performed |
1997-09-18 | Direction Drilling Operation Performed - Horizontal |
1997-09-19 | Finished Drilling |
1997-09-19 | Perforation Treatment Performed - Open-Hole Completion |
1997-09-20 | Rig Released |
1997-09-20 | Well Structure changed to Drain |
1997-10-09 | Well Log Performed |
2013-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-05-31 | Plug Back Performed |
2013-05-31 | Well Mode changed to Abandoned Zone |
2013-05-31 | Well Structure changed to Drain |
2019-09-17 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-09-11 | 705.00 | Horizontal |
1997-09-18 | 1044.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-09-19 | Open Hole/Barefoot Completion | 1034.00 | 1138.00 | 0 |
2013-05-31 | Packing Device Capped w/Cement | 968.00 | 976.00 | 0 |
For data sources see[5]