X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204090414000

Well Details

Well ID: 0204090414000
Loading map...
Location: 00/14-04-020-09W4/0
Location Alias: 00/14-04-20-09 W4M
Location Alias 2: 00/14-04-020-09 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 09
Section: 04
County/Municipality: Cypress County
Well Name: IMAGINEA JENNER 14-4-20-9
Operator Name: Cor4 Oil Corp.
License Number: 0159638
License Date: 1993-07-08
License Status: Issued
Spud Date: 1993-08-18
Final Drill Date: 1993-08-19
Well Total Depth: 718.00 m
Surface Hole Latitude: 50.671742
Surface Hole Longitude: -111.193843

For data sources see[1][2]

Well History

Date Event
1993-07-08 Obtained License
1993-08-18 Surface Casing Operation Performed
1993-08-19 Finished Drilling
1993-08-19 Production Casing Operation Performed
1993-08-19 Rig Released
1993-08-19 Well Mode changed to Drilled and Cased
1993-09-02 Well Log Performed
1993-09-18 Perforation Treatment Performed - Jet Perforation
1993-10-13 Perforation Treatment Performed - Fractured
1993-10-15 Perforation Treatment Performed - Jet Perforation
1993-10-18 Perforation Treatment Performed - Fractured
1993-10-20 Perforation Treatment Performed - Jet Perforation
1993-10-21 Perforation Treatment Performed - Fractured
1994-02-01 Well Began Production
1994-02-01 Well Fluid changed to Gas
1994-02-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-09-18 Perforation 665.80 666.20 7
1993-10-15 Perforation 486.00 486.50 7
1993-10-15 Perforation 487.00 487.50 7
1993-10-15 Perforation 490.50 491.00 7
1993-10-15 Perforation 491.50 492.00 7
1993-10-15 Perforation 493.00 493.50 7
1993-10-15 Perforation 494.80 495.20 7
1993-10-15 Perforation 495.80 496.20 7
1993-10-15 Perforation 497.00 497.50 7
1993-10-15 Perforation 498.00 498.50 7
1993-10-15 Perforation 500.00 500.50 7
1993-09-18 Perforation 666.50 667.00 7
1993-10-15 Perforation 502.80 503.20 7
1993-10-15 Perforation 505.00 505.50 7
1993-10-15 Perforation 511.00 511.50 7
1993-10-15 Perforation 517.80 518.20 7
1993-10-15 Perforation 519.50 520.00 7
1993-10-15 Perforation 524.50 525.00 7
1993-10-15 Perforation 527.80 528.20 7
1993-10-15 Perforation 532.00 532.50 7
1993-10-15 Perforation 533.00 533.50 7
1993-10-15 Perforation 535.00 535.50 7
1993-09-18 Perforation 669.50 670.00 7
1993-10-15 Perforation 536.50 537.00 7
1993-10-15 Perforation 540.00 540.50 7
1993-10-15 Perforation 544.00 544.50 7
1993-10-15 Perforation 552.00 552.50 7
1993-10-15 Perforation 565.00 565.50 7
1993-10-15 Perforation 568.00 568.50 7
1993-10-15 Perforation 572.00 572.50 7
1993-10-15 Perforation 575.00 575.50 7
1993-10-15 Perforation 580.50 581.00 7
1993-10-18 Fracture 486.00 581.00 0
1993-09-18 Perforation 671.00 671.50 7
1993-10-20 Perforation 359.00 359.50 7
1993-10-20 Perforation 370.20 370.80 7
1993-10-20 Perforation 377.80 378.20 7
1993-10-20 Perforation 380.00 380.50 7
1993-10-20 Perforation 385.00 385.50 7
1993-10-20 Perforation 386.80 387.20 7
1993-10-20 Perforation 388.00 388.50 7
1993-10-20 Perforation 393.20 393.80 7
1993-10-20 Perforation 395.00 395.50 7
1993-10-20 Perforation 401.00 401.50 7
1993-09-18 Perforation 672.00 672.50 7
1993-10-20 Perforation 406.50 407.00 7
1993-10-20 Perforation 409.50 410.00 7
1993-10-20 Perforation 411.50 412.00 7
1993-10-20 Perforation 413.00 413.50 7
1993-10-20 Perforation 421.00 421.50 7
1993-10-20 Perforation 422.00 422.50 7
1993-10-20 Perforation 423.00 423.50 7
1993-10-20 Perforation 425.50 426.00 7
1993-10-20 Perforation 431.50 432.00 7
1993-10-20 Perforation 438.00 438.50 7
1993-09-18 Perforation 674.00 674.50 7
1993-10-21 Fracture 359.00 438.50 0
1993-09-18 Perforation 682.80 683.20 7
1993-09-18 Perforation 684.50 685.00 7
1993-10-13 Fracture 665.80 685.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 7595 0.0 0.0 0.0
1995 8399 0.0 0.0 0.0
1996 8674 0.0 0.0 0.0
1997 8713 0.0 0.0 0.0
1998 8723 0.0 0.0 0.0
1999 8701 0.0 0.0 0.0
2000 8703 0.0 0.0 0.0
2001 8648 0.0 0.0 0.0
2002 8750 0.0 0.0 0.0
2003 8671 0.0 0.0 0.0
2004 8684 0.0 0.0 0.0
2005 8694 0.0 0.0 0.0
2006 8700 0.0 0.0 0.0
2007 8725 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References