If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204221004002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.675562,"lon":-112.9796,"icon":""}]} |
Location: 00/04-10-020-22W4/2 | |
Location Alias: 00/04-10-20-22 W4M | |
Location Alias 2: 00/04-10-020-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 22 | |
Section: 10 | |
County/Municipality: Vulcan County | |
Well Name: DAYLIGHT ET AL SHOLDICE 4-10-20-22 | |
Operator Name: Clearview Resources Ltd. | |
License Number: 0141038 | |
License Date: 1989-09-25 | |
License Status: Abandoned | |
Spud Date: 1989-09-28 | |
Final Drill Date: 1989-10-04 | |
Well Total Depth: 1580.00 m | |
Surface Hole Latitude: 50.675562 | |
Surface Hole Longitude: -112.979600 |
Date | Event |
---|---|
1989-09-25 | Obtained License |
1989-09-29 | Surface Casing Operation Performed |
1989-10-04 | Finished Drilling |
1989-10-04 | Well Log Performed |
1989-10-04 | Well Mode changed to Drilled and Cased |
1989-10-05 | Drill Stem Test Performed |
1989-10-06 | Production Casing Operation Performed |
1989-10-06 | Rig Released |
1989-11-01 | Well Log Performed |
1989-11-02 | Perforation Treatment Performed - Jet Perforation |
1994-04-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-04-07 | Plug Back Performed |
1994-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-04-09 | Perforation Treatment Performed - Jet Perforation |
1994-04-21 | Perforation Treatment Performed - Jet Perforation |
1994-09-24 | Well Began Production |
1994-09-24 | Well Fluid changed to Gas |
1994-09-24 | Well Mode changed to Flowing |
1999-07-08 | Well Fluid changed to Gas |
1999-07-08 | Well Mode changed to Suspended |
2000-08-15 | Well Fluid changed to Gas |
2000-08-15 | Well Mode changed to Flowing |
2006-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-20 | Plug Back Performed |
2006-10-20 | Well Fluid changed to Gas |
2006-10-20 | Well Log Performed |
2006-10-20 | Well Mode changed to Abandoned Zone |
2006-10-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-11-02 | Perforation | 1538.00 | 1542.00 | 13 |
1989-11-02 | Perforation | 1543.50 | 1547.00 | 13 |
1994-04-07 | Packing Device Capped w/Cement | 1510.00 | 1518.00 | 0 |
1994-04-08 | Packing Device Capped w/Cement | 912.00 | 920.00 | 0 |
1994-04-09 | Perforation | 585.50 | 590.90 | 13 |
1994-04-21 | Perforation | 466.00 | 470.00 | 13 |
2006-10-20 | Packing Device Capped w/Cement | 567.00 | 575.00 | 0 |
2006-10-20 | Packing Device Capped w/Cement | 315.00 | 456.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 1870 | 0.0 | 0.0 | 0.0 |
1995 | 6475 | 0.0 | 0.0 | 0.0 |
1996 | 5859 | 0.0 | 0.0 | 0.0 |
1997 | 4441 | 0.0 | 0.0 | 0.0 |
1998 | 3452 | 0.0 | 0.0 | 0.0 |
1999 | 1273 | 0.0 | 0.0 | 0.0 |
2000 | 797 | 0.0 | 0.0 | 0.0 |
For data sources see[5]