X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204230810000

Well Details

Well ID: 0204230810000
Loading map...
Location: 00/10-08-020-23W4/0
Location Alias: 00/10-08-20-23 W4M
Location Alias 2: 00/10-08-020-23 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 23
Section: 08
County/Municipality: Vulcan County
Well Name: HOUSTON SHOLDICE 10-8-20-23
Operator Name: Houston Oil & Gas Ltd.
License Number: 0057125
License Date: 1976-02-17
License Status: Abandoned
Spud Date: 1976-02-18
Final Drill Date: 1976-03-02
Well Total Depth: 1743.50 m
Surface Hole Latitude: 50.682098
Surface Hole Longitude: -113.150786

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-17 Obtained License
1976-02-26 Drill Stem Test Performed
1976-03-02 Finished Drilling
1976-03-02 Well Mode changed to Drilled and Cased
1976-03-03 Drill Stem Test Performed
1976-03-04 Drill Stem Test Performed
1976-03-05 Production Casing Operation Performed
1976-03-12 Perforation Treatment Performed - Jet Perforation
1976-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-19 Perforation Treatment Performed - Jet Perforation
1976-03-20 Well Began Production
1976-03-20 Well Fluid changed to Crude Oil
1976-03-20 Well Mode changed to Flowing
1987-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-18 Perforation Treatment Performed - Fractured
1987-09-18 Well Log Performed
1987-11-02 Perforation Treatment Performed - Chemical Squeeze
1989-05-31 Well Fluid changed to Crude Oil
1989-05-31 Well Mode changed to Suspended
1990-05-02 Perforation Treatment Performed - Jet Perforation
1990-05-17 Well Fluid changed to Crude Oil
1990-05-17 Well Mode changed to Pumping
1994-03-31 Well Fluid changed to Crude Oil
1994-03-31 Well Mode changed to Suspended
2007-02-08 Well Log Performed
2007-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-11 Plug Back Performed
2007-02-11 Well Fluid changed to Crude Oil
2007-02-11 Well Mode changed to Abandoned Zone
2007-11-05 Well Abandoned
2007-11-05 Well Fluid changed to Crude Oil
2007-11-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-12 Perforation 1712.40 1714.20 3
1976-03-13 Acid Treatment 1712.40 1714.20 0
1976-03-19 Perforation 1713.00 1714.80 3
1987-09-18 Fracture 1712.40 1714.80 0
1987-09-18 Acid Treatment 1712.40 1714.80 0
1987-11-02 Chemical Squeeze 1712.40 1714.80 0
1990-05-02 Perforation 1710.50 1715.00 13
2007-02-11 Packing Device Capped w/Cement 1692.00 1700.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1102 0.0 0.0 0.0
1977 911 0.0 0.0 0.0
1978 692 0.0 0.0 0.0
1979 678 0.0 0.0 0.0
1980 656 0.0 0.0 0.0
1981 1885 0.0 0.0 0.0
1982 3240 0.0 0.0 0.0
1983 3303 0.0 0.0 0.0
1984 8159 0.0 0.0 0.0
1985 8380 0.0 0.0 0.0
1986 8710 0.0 0.0 0.0
1987 5572 0.0 0.0 0.0
1988 8419 0.0 0.0 0.0
1989 1968 0.0 0.0 0.0
1990 5290 0.0 0.0 0.0
1991 8683 0.0 0.0 0.0
1992 8306 0.0 0.0 0.0
1993 6065 0.0 0.0 0.0
1994 1338 0.0 0.0 0.0

For data sources see[5]

References