X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214062306002

Well Details

Well ID: 0214062306002
Loading map...
Location: 00/06-23-021-06W4/2
Location Alias: 00/06-23-21-06 W4M
Location Alias 2: 00/06-23-021-06 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 23
County/Municipality: Special Areas No. 2
Well Name: WLEC ATL-BUFF 6-23-21-6
Operator Name: West Lake Energy Corp.
License Number: 0051537
License Date: 1974-10-18
License Status: Issued
Spud Date: 1974-10-26
Final Drill Date: 1974-10-30
Well Total Depth: 975.40 m
Surface Hole Latitude: 50.796091
Surface Hole Longitude: -110.734810

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-18 Obtained License
1974-10-30 Drill Stem Test Performed
1974-10-30 Finished Drilling
1974-10-30 Well Mode changed to Drilled and Cased
1974-10-31 Drill Stem Test Performed
1974-11-01 Production Casing Operation Performed
1974-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-19 Perforation Treatment Performed - Jet Perforation
1974-12-10 Perforation Treatment Performed - Fractured
1975-10-07 Perforation Treatment Performed - Cement Squeeze
1975-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-09 Perforation Treatment Performed - Jet Perforation
2001-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-29 Plug Back Performed
2001-08-29 Well Log Performed
2001-08-31 Perforation Treatment Performed - Jet Perforation
2001-08-31 Well Mode changed to Drilled and Cased
2001-09-01 Perforation Treatment Performed - Fractured
2001-09-03 Perforation Treatment Performed - Jet Perforation
2001-09-04 Perforation Treatment Performed - Fractured
2001-11-14 Well Began Production
2001-11-14 Well Fluid changed to Gas
2001-11-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-11-19 Perforation 905.00 906.50 7
2001-08-31 Perforation 465.50 467.50 7
2001-09-01 Fracture 465.50 583.00 0
2001-09-03 Perforation 401.00 403.00 7
2001-09-03 Perforation 332.50 334.50 7
2001-09-04 Fracture 332.50 403.00 0
1974-11-19 Acid Treatment 905.00 906.50 0
1974-12-10 Fracture 905.00 906.50 0
1975-10-07 Cement Squeeze 905.00 906.50 0
1975-10-09 Perforation 912.60 915.00 7
1975-10-09 Acid Treatment 912.60 915.00 0
2001-08-29 Packing Device Capped w/Cement 901.00 909.00 0
2001-08-31 Perforation 581.00 583.00 7
2001-08-31 Perforation 508.00 509.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 960 0.0 0.0 0.0
2002 2879 0.0 0.0 0.0
2003 8755 0.0 0.0 0.0
2004 8761 0.0 0.0 0.0
2005 8738 0.0 0.0 0.0
2006 8731 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8636 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References