X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214071616000

Well Details

Well ID: 0214071616000
Loading map...
Location: 00/16-16-021-07W4/0
Location Alias: 00/16-16-21-07 W4M
Location Alias 2: 00/16-16-021-07 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 07
Section: 16
County/Municipality: Special Areas No. 2
Well Name: WLEC ATL-BUFF 16-16-21-7
Operator Name: West Lake Energy Corp.
License Number: 0173185
License Date: 1994-11-30
License Status: Suspension
Spud Date: 1995-01-08
Final Drill Date: 1995-01-13
Well Total Depth: 1071.00 m
Surface Hole Latitude: 50.788542
Surface Hole Longitude: -110.907110

For data sources see[1][2]

Well History

Date Event
1994-11-30 Obtained License
1995-01-08 Well Log Performed
1995-01-09 Surface Casing Operation Performed
1995-01-13 Finished Drilling
1995-01-13 Well Mode changed to Drilled and Cased
1995-01-14 Drill Stem Test Performed
1995-01-14 Well Log Performed
1995-01-15 Drill Stem Test Performed
1995-01-17 Production Casing Operation Performed
1995-01-17 Rig Released
1995-01-31 Perforation Treatment Performed - Jet Perforation
1995-01-31 Well Log Performed
1995-02-01 Perforation Treatment Performed - Jet Perforation
1995-02-01 Well Log Performed
1995-02-04 Perforation Treatment Performed - Fractured
1997-07-07 Well Began Production
1997-07-07 Well Fluid changed to Gas
1997-07-07 Well Mode changed to Flowing
1998-09-08 Well Fluid changed to Gas
1998-09-08 Well Mode changed to Suspended
1999-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-16 Plug Back Performed
1999-11-16 Well Fluid changed to Gas
1999-11-16 Well Mode changed to Abandoned Zone
2000-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-20 Plug Back Performed
2000-11-21 Well Abandoned
2008-07-26 Perforation Treatment Performed - Jet Perforation
2008-07-29 Perforation Treatment Performed - Jet Perforation
2008-07-31 Perforation Treatment Performed - Cement Squeeze
2008-07-31 Plug Back Performed
2008-08-03 Perforation Treatment Performed - Jet Perforation
2008-09-01 Well Fluid changed to Gas
2008-09-01 Well Mode changed to Flowing
2010-03-01 Well Fluid changed to Gas
2010-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-31 Perforation 1001.00 1002.00 13
2008-07-29 Perforation 980.50 984.00 13
2008-07-31 Cement Squeeze 969.00 974.00 0
2008-07-31 Cement Squeeze 975.50 978.50 0
2008-07-31 Cement Squeeze 980.50 984.00 0
2008-08-03 Perforation 1001.00 1002.00 13
1995-02-01 Perforation 969.00 974.00 13
1995-02-01 Perforation 975.50 978.50 13
1995-02-01 Perforation 980.50 984.00 13
1995-02-04 Fracture 969.00 984.00 0
1999-11-16 Packing Device Capped w/Cement 991.00 999.00 0
2000-11-20 Packing Device Capped w/Cement 947.60 955.60 0
2008-07-26 Perforation 969.00 974.00 13
2008-07-29 Perforation 975.50 978.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4416 0.0 0.0 0.0
1998 8232 0.0 0.0 0.0
1999 2041 0.0 0.0 0.0
2008 2287 0.0 0.0 0.0
2009 2159 0.0 0.0 0.0

For data sources see[5]

References