X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214082916000

Well Details

Well ID: 0214082916000
Loading map...
Location: 00/16-29-021-08W4/0
Location Alias: 00/16-29-21-08 W4M
Location Alias 2: 00/16-29-021-08 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 08
Section: 29
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK JENNER 16-29-21-8
Operator Name: Ridgeback Resources Inc.
License Number: 0055562
License Date: 1975-10-27
License Status: Abandoned
Spud Date: 1975-11-07
Final Drill Date: 1975-11-08
Well Total Depth: 477.60 m
Surface Hole Latitude: 50.819338
Surface Hole Longitude: -111.067612

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-27 Obtained License
1975-11-08 Finished Drilling
1975-11-08 Production Casing Operation Performed
1975-11-08 Well Mode changed to Drilled and Cased
1975-11-26 Perforation Treatment Performed - Bullet Perforation
1975-11-26 Perforation Treatment Performed - Selective Bullet Perforations
1975-11-29 Perforation Treatment Performed - Fractured
1976-09-12 Well Began Production
1976-09-12 Well Fluid changed to Gas
1976-09-12 Well Mode changed to Flowing
1988-09-01 Well Fluid changed to Gas
1988-09-01 Well Mode changed to Suspended
1992-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-25 Plug Back Performed
1992-05-25 Well Fluid changed to Gas
1992-05-25 Well Mode changed to Abandoned
1992-07-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-26 Bullet Perforation 375.50 375.80 3
1992-05-25 Packing Device Capped w/Cement 362.00 370.00 0
1975-11-26 Bullet Perforation 408.40 408.70 3
1975-11-26 Selective Bullet Perforations 409.00 424.30 0
1975-11-26 Selective Bullet Perforations 424.90 425.50 0
1975-11-26 Bullet Perforation 435.90 436.20 3
1975-11-26 Bullet Perforation 436.50 436.50 7
1975-11-26 Bullet Perforation 436.80 437.10 7
1975-11-26 Bullet Perforation 437.40 439.50 3
1975-11-29 Fracture 375.50 439.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2530 0.0 0.0 0.0
1977 6574 0.0 0.0 0.0
1978 5835 0.0 0.0 0.0
1979 6211 0.0 0.0 0.0
1980 5176 0.0 0.0 0.0
1981 6375 0.0 0.0 0.0
1982 4940 0.0 0.0 0.0
1983 6973 0.0 0.0 0.0
1984 7318 0.0 0.0 0.0
1985 8757 0.0 0.0 0.0
1986 7319 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0

For data sources see[5]

References