X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214231814002

Well Details

Well ID: 0214231814002
Loading map...
Location: 00/14-18-021-23W4/2
Location Alias: 00/14-18-21-23 W4M
Location Alias 2: 00/14-18-021-23 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 23
Section: 18
County/Municipality: Siksika 146
Well Name: ECA HERRON 14-18-21-23
Operator Name: Ovintiv Canada ULC
License Number: 0189605
License Date: 1996-07-12
License Status: Issued
Spud Date: 1996-07-19
Final Drill Date: 1996-07-27
Well Total Depth: 1672.00 m
Surface Hole Latitude: 50.789671
Surface Hole Longitude: -113.180890

For data sources see[1][2]

Well History

Date Event
1996-07-12 Obtained License
1996-07-20 Surface Casing Operation Performed
1996-07-22 Direction Drilling Operation Performed - Deviate
1996-07-27 Finished Drilling
1996-07-27 Well Log Performed
1996-07-27 Well Mode changed to Drilled and Cased
1996-07-28 Well Log Performed
1996-07-29 Production Casing Operation Performed
1996-07-29 Rig Released
1996-08-17 Perforation Treatment Performed - Jet Perforation
1996-08-17 Well Log Performed
1996-08-20 Perforation Treatment Performed - Fractured
1996-08-22 Perforation Treatment Performed - Jet Perforation
1996-08-22 Well Log Performed
1998-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-16 Plug Back Performed
1998-11-16 Well Log Performed
1998-11-17 Well Log Performed
1998-11-19 Perforation Treatment Performed - Jet Perforation
1998-11-19 Well Log Performed
1998-11-22 Perforation Treatment Performed - Fractured
1998-12-01 Well Began Production
1998-12-01 Well Fluid changed to Gas
1998-12-01 Well Mode changed to Flowing
1998-12-02 Well Fluid changed to Gas
1998-12-02 Well Mode changed to Flowing
2001-06-12 Perforation Treatment Performed - Jet Perforation
2001-06-12 Well Log Performed
2001-06-23 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-22 601.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-17 Perforation 1644.50 1647.00 13
2001-06-12 Perforation 605.00 607.00 13
2001-06-23 Fracture 598.00 607.00 0
1996-08-20 Fracture 1644.50 1647.00 0
1996-08-22 Perforation 1631.70 1633.20 13
1998-11-16 Packing Device Capped w/Cement 1617.00 1625.00 0
1998-11-19 Perforation 923.70 929.00 14
1998-11-22 Fracture 923.70 929.00 0
2001-06-12 Perforation 598.00 599.50 13
2001-06-12 Perforation 595.50 596.50 13
2001-06-12 Perforation 586.50 588.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 744 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 7319 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 6552 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8560 0.0 0.0 0.0
2013 8251 0.0 0.0 0.0
2014 8440 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 8606 0.0 0.0 0.0
2017 8403 0.0 0.0 0.0
2018 8541 0.0 0.0 0.0
2019 8281 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[6]

References