X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214232901002

Well Details

Well ID: 0214232901002
Loading map...
Location: 00/01-29-021-23W4/2
Location Alias: 00/01-29-21-23 W4M
Location Alias 2: 00/01-29-021-23 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 23
Section: 29
County/Municipality: Siksika 146
Well Name: ECA BLACKFT 1-29-21-23
Operator Name: Ovintiv Canada ULC
License Number: 0195627
License Date: 1996-12-19
License Status: Amended
Spud Date: 1997-02-02
Final Drill Date: 1997-02-08
Well Total Depth: 1587.00 m
Surface Hole Latitude: 50.807340
Surface Hole Longitude: -113.147805

For data sources see[1][2]

Well History

Date Event
1996-12-19 Obtained License
1997-02-03 Surface Casing Operation Performed
1997-02-05 Direction Drilling Operation Performed - Deviate
1997-02-07 Well Log Performed
1997-02-08 Drill Stem Test Performed
1997-02-08 Finished Drilling
1997-02-08 Well Log Performed
1997-02-08 Well Mode changed to Drilled and Cased
1997-02-10 Production Casing Operation Performed
1997-02-10 Rig Released
1997-02-11 Well Log Performed
1997-02-19 Well Log Performed
1997-02-20 Perforation Treatment Performed - Jet Perforation
1997-02-22 Perforation Treatment Performed - Fractured
1997-08-06 Perforation Treatment Performed - Jet Perforation
1997-08-09 Perforation Treatment Performed - Fractured
1998-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-19 Well Log Performed
1998-08-06 Well Log Performed
1998-12-01 Well Began Production
1998-12-01 Well Fluid changed to Gas
1998-12-01 Well Mode changed to Flowing
2001-06-12 Perforation Treatment Performed - Jet Perforation
2001-06-12 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-02-05 960.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-20 Perforation 1543.70 1546.60 17
1997-02-22 Fracture 1543.70 1546.60 0
1997-08-06 Perforation 868.40 874.50 14
1997-08-09 Fracture 868.40 874.50 0
1998-07-19 Packing Device Capped w/Cement 1517.00 1525.00 0
2001-06-12 Perforation 590.00 591.00 13
2001-06-12 Perforation 587.00 588.00 13
2001-06-12 Perforation 579.50 581.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 744 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7295 0.0 0.0 0.0
2008 7910 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 4367 0.0 0.0 0.0
2011 8505 0.0 0.0 0.0
2012 8560 0.0 0.0 0.0
2013 8323 0.0 0.0 0.0
2014 8440 0.0 0.0 0.0
2015 8451 0.0 0.0 0.0
2016 8606 0.0 0.0 0.0
2017 8403 0.0 0.0 0.0
2018 8541 0.0 0.0 0.0
2019 8281 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[6]

References