X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224052306002

Well Details

Well ID: 0224052306002
Loading map...
Location: 00/06-23-022-05W4/2
Location Alias: 00/06-23-22-05 W4M
Location Alias 2: 00/06-23-022-05 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 05
Section: 23
County/Municipality: Special Areas No. 3
Well Name: CDN-SUP CDNRES BIND 6-23-22-5
Operator Name: ExxonMobil Canada Resources Company
License Number: 0060748
License Date: 1976-10-21
License Status: Re-Entered
Spud Date: 1976-10-26
Final Drill Date: 1976-10-28
Well Total Depth: 501.40 m
Surface Hole Latitude: 50.883342
Surface Hole Longitude: -110.594912

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-21 Obtained License
1976-10-27 Lost Circulation Occurred
1976-10-28 Finished Drilling
1976-10-28 Production Casing Operation Performed
1976-10-28 Well Mode changed to Drilled and Cased
1976-11-30 Perforation Treatment Performed - Jet Perforation
1976-12-01 Perforation Treatment Performed - Fractured
1976-12-04 Perforation Treatment Performed - Fractured
1981-06-23 Perforation Treatment Performed - Jet Perforation
1981-06-24 Perforation Treatment Performed - Fractured
1982-12-29 Well Began Production
1982-12-29 Well Fluid changed to Gas
1982-12-29 Well Mode changed to Flowing
1992-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-26 Plug Back Performed
1992-08-26 Well Abandoned
1992-08-26 Well Fluid changed to Gas
1992-08-26 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-30 Perforation 471.80 473.70 13
1992-08-26 Packing Device Capped w/Cement 362.00 370.00 0
1976-12-01 Fracture 471.80 473.70 0
1976-12-04 Fracture 471.80 473.70 0
1981-06-23 Perforation 380.40 381.00 7
1981-06-23 Perforation 391.60 392.60 7
1981-06-23 Perforation 405.40 407.20 7
1981-06-23 Perforation 415.80 416.40 7
1981-06-24 Fracture 380.40 416.40 0
1992-08-26 Packing Device Capped w/Cement 454.00 462.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 72 0.0 0.0 0.0
1983 1578 0.0 0.0 0.0
1984 1863 0.0 0.0 0.0
1985 2563 0.0 0.0 0.0
1986 2061 0.0 0.0 0.0
1987 4674 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-10-27 Lost Circulation 91.40 222.50

For data sources see[6]

References