X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224061116000

Well Details

Well ID: 0224061116000
Loading map...
Location: 00/16-11-022-06W4/0
Location Alias: 00/16-11-22-06 W4M
Location Alias 2: 00/16-11-022-06 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 06
Section: 11
County/Municipality: Special Areas No. 3
Well Name: CITY OF MEDH ATL-BUFF 16-11-22-6
Operator Name: City Of Medicine Hat
License Number: 0311683
License Date: 2004-07-14
License Status: Suspension
Spud Date: 2004-07-17
Final Drill Date: 2004-07-18
Well Total Depth: 439.00 m
Surface Hole Latitude: 50.862807
Surface Hole Longitude: -110.720811

For data sources see[1][2]

Well History

Date Event
2004-07-14 Obtained License
2004-07-18 Finished Drilling
2004-07-18 Production Casing Operation Performed
2004-07-18 Rig Released
2004-07-18 Surface Casing Operation Performed
2004-07-18 Well Mode changed to Drilled and Cased
2004-07-22 Well Log Performed
2004-07-24 Well Log Performed
2004-07-26 Perforation Treatment Performed - Jet Perforation
2004-07-29 Perforation Treatment Performed - Fractured
2004-08-01 Perforation Treatment Performed - Jet Perforation
2004-08-03 Perforation Treatment Performed - Fractured
2004-08-06 Perforation Treatment Performed - Jet Perforation
2004-08-10 Perforation Treatment Performed - Fractured
2004-10-19 Well Began Production
2004-10-19 Well Fluid changed to Gas
2004-10-19 Well Mode changed to Flowing
2018-12-20 Well Fluid changed to Gas
2018-12-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-07-26 Perforation 367.00 373.00 7
2004-08-10 Fracture 286.50 290.50 0
2004-07-29 Fracture 367.00 373.00 0
2004-08-01 Perforation 305.50 309.50 7
2004-08-01 Perforation 313.50 315.50 7
2004-08-03 Fracture 305.50 309.50 0
2004-08-03 Fracture 313.50 315.50 0
2004-08-06 Perforation 279.50 283.50 7
2004-08-06 Perforation 286.50 290.50 7
2004-08-10 Fracture 279.50 283.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1740 0.0 0.0 0.0
2005 8342 0.0 0.0 0.0
2006 8147 0.0 0.0 0.0
2007 8685 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 8707 0.0 0.0 0.0
2010 8708 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 716 0.0 0.0 0.0
2014 7331 0.0 0.0 0.0
2015 2439 0.0 0.0 0.0
2016 7299 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 720 0.0 0.0 0.0

For data sources see[5]

References