X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224062714000

Well Details

Well ID: 0224062714000
Loading map...
Location: 00/14-27-022-06W4/0
Location Alias: 00/14-27-22-06 W4M
Location Alias 2: 00/14-27-022-06 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 06
Section: 27
County/Municipality: Special Areas No. 3
Well Name: CITY OF MEDH BIND 14-27-22-6
Operator Name: City Of Medicine Hat
License Number: 0335475
License Date: 2005-07-27
License Status: Suspension
Spud Date: 2005-08-06
Final Drill Date: 2005-08-07
Well Total Depth: 505.00 m
Surface Hole Latitude: 50.906160
Surface Hole Longitude: -110.755457

For data sources see[1][2]

Well History

Date Event
2005-07-27 Obtained License
2005-08-06 Surface Casing Operation Performed
2005-08-07 Finished Drilling
2005-08-07 Production Casing Operation Performed
2005-08-07 Rig Released
2005-08-07 Well Mode changed to Drilled and Cased
2005-08-30 Well Log Performed
2005-09-02 Perforation Treatment Performed - Jet Perforation
2005-09-03 Perforation Treatment Performed - Fractured
2005-09-07 Perforation Treatment Performed - Jet Perforation
2005-09-08 Perforation Treatment Performed - Fractured
2005-09-19 Perforation Treatment Performed - Jet Perforation
2005-09-20 Perforation Treatment Performed - Fractured
2005-12-21 Well Began Production
2005-12-21 Well Fluid changed to Gas
2005-12-21 Well Mode changed to Flowing
2018-12-21 Well Fluid changed to Gas
2018-12-21 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-02 Perforation 444.50 446.50 13
2005-09-19 Perforation 360.50 363.50 7
2005-09-20 Fracture 379.00 381.00 0
2005-09-20 Fracture 373.50 376.50 0
2005-09-20 Fracture 364.50 365.50 0
2005-09-20 Fracture 360.50 363.50 0
2005-09-03 Fracture 444.50 446.50 0
2005-09-07 Perforation 396.00 398.00 7
2005-09-07 Perforation 388.00 394.00 7
2005-09-08 Fracture 396.00 398.00 0
2005-09-08 Fracture 388.00 394.00 0
2005-09-19 Perforation 379.00 381.00 7
2005-09-19 Perforation 373.50 376.50 7
2005-09-19 Perforation 364.50 365.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 696 0.0 0.0 0.0
2006 8147 0.0 0.0 0.0
2007 8685 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 6542 0.0 0.0 0.0
2010 5851 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 8474 0.0 0.0 0.0
2013 8295 0.0 0.0 0.0
2014 8551 0.0 0.0 0.0
2015 8717 0.0 0.0 0.0
2016 4878 0.0 0.0 0.0
2017 5847 0.0 0.0 0.0
2018 672 0.0 0.0 0.0

For data sources see[5]

References