X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224063006000

Well Details

Well ID: 0224063006000
Loading map...
Location: 00/06-30-022-06W4/0
Location Alias: 00/06-30-22-06 W4M
Location Alias 2: 00/06-30-022-06 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 06
Section: 30
County/Municipality: Special Areas No. 3
Well Name: CITY OF MEDH ATL-BUFF 6-30-22-6
Operator Name: City Of Medicine Hat
License Number: 0309957
License Date: 2004-06-09
License Status: Suspension
Spud Date: 2004-06-21
Final Drill Date: 2004-06-23
Well Total Depth: 425.00 m
Surface Hole Latitude: 50.899412
Surface Hole Longitude: -110.829199

For data sources see[1][2]

Well History

Date Event
2004-06-09 Obtained License
2004-06-21 Surface Casing Operation Performed
2004-06-23 Finished Drilling
2004-06-23 Well Mode changed to Drilled and Cased
2004-06-24 Production Casing Operation Performed
2004-06-24 Rig Released
2004-06-27 Well Log Performed
2004-06-30 Perforation Treatment Performed - Jet Perforation
2004-07-13 Perforation Treatment Performed - Fractured
2004-07-16 Perforation Treatment Performed - Jet Perforation
2004-07-18 Perforation Treatment Performed - Fractured
2004-07-22 Perforation Treatment Performed - Jet Perforation
2004-07-24 Perforation Treatment Performed - Fractured
2004-10-10 Well Began Production
2004-10-10 Well Fluid changed to Gas
2004-10-10 Well Mode changed to Flowing
2018-12-20 Well Fluid changed to Gas
2018-12-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-06-30 Perforation 354.00 359.00 13
2004-07-24 Fracture 265.50 267.50 0
2004-07-24 Fracture 269.00 271.00 0
2004-07-24 Fracture 274.00 276.00 0
2004-07-13 Fracture 354.00 359.00 0
2004-07-16 Perforation 284.00 291.00 7
2004-07-18 Fracture 284.00 291.00 0
2004-07-22 Perforation 254.00 257.00 7
2004-07-22 Perforation 265.50 267.50 7
2004-07-22 Perforation 269.00 271.00 7
2004-07-22 Perforation 274.00 276.00 7
2004-07-24 Fracture 254.00 257.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1915 0.0 0.0 0.0
2005 8616 0.0 0.0 0.0
2006 8434 0.0 0.0 0.0
2007 8685 0.0 0.0 0.0
2008 8444 0.0 0.0 0.0
2009 8683 0.0 0.0 0.0
2010 8708 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 8535 0.0 0.0 0.0
2013 5975 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8714 0.0 0.0 0.0
2016 8738 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 720 0.0 0.0 0.0

For data sources see[5]

References