X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234080606000

Well Details

Well ID: 0234080606000
Loading map...
Location: 00/06-06-023-08W4/0
Location Alias: 00/06-06-23-08 W4M
Location Alias 2: 00/06-06-023-08 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 08
Section: 06
County/Municipality: Special Areas No. 3
Well Name: RENAISSANCE BUFFALO 6-6-23-8
Operator Name: Husky Oil Operations Limited
License Number: 0140720
License Date: 1989-08-23
License Status: RecCertified
Spud Date: 1989-08-24
Final Drill Date: 1989-08-26
Well Total Depth: 954.00 m
Surface Hole Latitude: 50.925826
Surface Hole Longitude: -111.113579

For data sources see[1][2]

Well History

Date Event
1989-08-23 Obtained License
1989-08-25 Surface Casing Operation Performed
1989-08-26 Finished Drilling
1989-08-26 Well Mode changed to Drilled and Cased
1989-08-27 Production Casing Operation Performed
1989-08-27 Rig Released
1989-08-27 Well Log Performed
1989-09-01 Perforation Treatment Performed - Jet Perforation
1989-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-08 Perforation Treatment Performed - Jet Perforation
1989-09-08 Plug Back Performed
1989-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-12 Perforation Treatment Performed - Jet Perforation
1989-09-12 Plug Back Performed
1989-09-12 Well Began Production
1989-09-12 Well Fluid changed to Crude Oil
1989-09-12 Well Mode changed to Pumping
1990-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-09 Perforation Treatment Performed - Jet Perforation
1990-02-09 Plug Back Performed
1990-02-09 Well Fluid changed to Crude Oil
1990-02-09 Well Mode changed to Abandoned Zone
1990-02-11 Perforation Treatment Performed - Fractured
1991-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-05-11 Perforation Treatment Performed - Jet Perforation
1991-05-11 Plug Back Performed
1994-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-10 Plug Back Performed
1994-02-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-09-01 Perforation 937.00 940.00 13
1990-02-09 Perforation 838.50 840.00 13
1990-02-11 Fracture 838.50 840.00 0
1991-05-11 Packing Device Capped w/Cement 827.00 835.00 0
1991-05-11 Perforation 743.00 744.50 13
1994-02-10 Packing Device Capped w/Cement 728.00 736.00 0
1989-09-01 Perforation 943.00 945.00 13
1989-09-02 Acid Treatment 937.00 945.00 0
1989-09-06 Acid Treatment 937.00 945.00 0
1989-09-08 Packing Device Capped w/Cement 927.50 935.50 0
1989-09-08 Perforation 922.00 923.50 13
1989-09-12 Packing Device Capped w/Cement 917.50 920.50 0
1989-09-12 Perforation 911.00 912.50 13
1990-02-09 Packing Device Capped w/Cement 897.00 905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1344 0.0 0.0 0.0
1990 1 0.0 0.0 0.0

For data sources see[5]

References