X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244080912002

Well Details

Well ID: 0244080912002
Loading map...
Location: 00/12-09-024-08W4/2
Location Alias: 00/12-09-24-08 W4M
Location Alias 2: 00/12-09-024-08 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 08
Section: 09
County/Municipality: Special Areas No. 3
Well Name: EOG ATL-BUFF 12-9-24-8
Operator Name: Canadian Natural Resources Limited
License Number: 0253246
License Date: 2001-03-27
License Status: RecCertified
Spud Date: 2001-03-30
Final Drill Date: 2001-04-02
Well Total Depth: 951.00 m
Surface Hole Latitude: 51.032229
Surface Hole Longitude: -111.072263

For data sources see[1][2]

Well History

Date Event
2001-03-27 Obtained License
2001-03-31 Surface Casing Operation Performed
2001-04-02 Finished Drilling
2001-04-02 Production Casing Operation Performed
2001-04-02 Rig Released
2001-04-02 Well Log Performed
2001-04-02 Well Mode changed to Drilled and Cased
2001-04-10 Perforation Treatment Performed - Jet Perforation
2001-07-04 Perforation Treatment Performed - Fractured
2001-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-11 Perforation Treatment Performed - Jet Perforation
2001-08-11 Plug Back Performed
2001-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-27 Plug Back Performed
2001-09-27 Well Mode changed to Abandoned Zone
2001-09-28 Perforation Treatment Performed - Jet Perforation
2008-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-29 Plug Back Performed
2008-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-04-10 Perforation 921.00 923.00 14
2001-04-10 Perforation 910.50 913.00 14
2001-07-04 Fracture 910.50 923.00 0
2001-08-11 Packing Device Capped w/Cement 899.00 907.00 0
2001-08-11 Perforation 888.00 889.00 14
2001-09-27 Packing Device Capped w/Cement 877.00 885.00 0
2001-09-28 Perforation 749.80 750.50 14
2008-10-29 Packing Device Capped w/Cement 732.00 740.00 0

For data sources see[4]



References