X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244292510000

Well Details

Well ID: 0244292510000
Loading map...
Location: 00/10-25-024-29W4/0
Location Alias: 00/10-25-24-29 W4M
Location Alias 2: 00/10-25-024-29 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 29
Section: 25
County/Municipality: Calgary
Well Name: JEFF LAKE ET AL CROSS 10-25-24-29
Operator Name: CNOOC Petroleum North America ULC
License Number: 0027019
License Date: 1964-09-22
License Status: RecCertified
Spud Date: 1964-10-25
Final Drill Date: 1964-12-22
Well Total Depth: 2635.30 m
Surface Hole Latitude: 51.076440
Surface Hole Longitude: -113.920643

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-09-22 Obtained License
1964-11-14 Drill Stem Test Performed
1964-11-16 Drill Stem Test Performed
1964-12-10 Drill Stem Test Performed
1964-12-18 Liner Casing Operation Performed
1964-12-22 Finished Drilling
1964-12-22 Perforation Treatment Performed - Open-Hole Completion
1964-12-22 Well Mode changed to Drilled and Cased
1965-05-14 Well Began Production
1965-05-14 Well Fluid changed to Gas
1965-05-14 Well Mode changed to Flowing
1965-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-03 Perforation Treatment Performed - Condensate Squeeze
1965-07-03 Perforation Treatment Performed - Nitrogen Treatment
1965-12-11 Perforation Treatment Performed - Condensate Squeeze
1966-07-10 Perforation Treatment Performed - Cement Plug
1966-07-10 Perforation Treatment Performed - Jet Perforation
1966-07-13 Perforation Treatment Performed - Bullet Perforation
1966-07-14 Perforation Treatment Performed - Acid Wash - No Pressure
1966-07-16 Perforation Treatment Performed - Cement Plug
1966-07-20 Well Abandoned
1966-07-20 Well Fluid changed to Gas
1966-07-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-12-22 Open Hole/Barefoot Completion 2607.00 2635.30 0
1966-07-16 Cement Plug 2179.00 2227.50 0
1965-07-03 Nitrogen Treatment 2607.00 2635.30 0
1965-07-03 Condensate Squeeze 2607.00 2635.30 0
1965-07-03 Acid Treatment 2607.00 2635.30 0
1965-12-11 Condensate Squeeze 2607.00 2635.30 0
1966-07-10 Cement Plug 2226.90 2229.60 0
1966-07-10 Perforation 2223.20 2225.00 7
1966-07-13 Bullet Perforation 2222.60 2225.00 7
1966-07-14 Acid Wash 2222.60 2225.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References