If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254291010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.118759,"lon":-113.96857,"icon":""}]} |
Location: 00/10-10-025-29W4/0 | |
Location Alias: 00/10-10-25-29 W4M | |
Location Alias 2: 00/10-10-025-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 29 | |
Section: 10 | |
County/Municipality: Calgary | |
Well Name: TRIAD ET AL CROSS 10-10-25-29 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0032182 | |
License Date: 1967-05-31 | |
License Status: RecCertified | |
Spud Date: 1967-06-05 | |
Final Drill Date: 1967-06-25 | |
Well Total Depth: 2285.70 m | |
Surface Hole Latitude: 51.118759 | |
Surface Hole Longitude: -113.968570 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-05-31 | Obtained License |
1967-06-25 | Drill Stem Test Performed |
1967-06-25 | Finished Drilling |
1967-06-27 | Drill Stem Test Performed |
1967-06-28 | Production Casing Operation Performed |
1967-09-11 | Perforation Treatment Performed - Jet Perforation |
1967-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-11-02 | Perforation Treatment Performed - Fractured |
1968-12-09 | Well Mode changed to Drilled and Cased |
1979-09-20 | Well Began Production |
1979-09-20 | Well Fluid changed to Gas |
1979-09-20 | Well Mode changed to Flowing |
1985-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-06-25 | Plug Back Performed |
1985-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-06-26 | Plug Back Performed |
1985-06-26 | Well Fluid changed to Gas |
1985-06-26 | Well Mode changed to Abandoned |
1985-06-27 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-09-11 | Perforation | 2263.10 | 2267.10 | 7 |
1967-09-12 | Acid Treatment | 2263.10 | 2267.10 | 0 |
1967-11-02 | Fracture | 2263.10 | 2267.10 | 0 |
1985-06-25 | Packing Device Capped w/Cement | 2238.00 | 2245.00 | 0 |
1985-06-26 | Packing Device Capped w/Cement | 1743.00 | 1750.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 224 | 0.0 | 0.0 | 0.0 |
1979 | 1515 | 0.0 | 0.0 | 0.0 |
1980 | 5711 | 0.0 | 0.0 | 0.0 |
1981 | 4227 | 0.0 | 0.0 | 0.0 |
1982 | 2392 | 0.0 | 0.0 | 0.0 |
1983 | 1965 | 0.0 | 0.0 | 0.0 |
1984 | 919 | 0.0 | 0.0 | 0.0 |
For data sources see[5]