X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0255062213000

Well Details

Well ID: 0255062213000
Loading map...
Location: 00/13-22-025-06W5/0
Location Alias: 00/13-22-25-06 W5M
Location Alias 2: 00/13-22-025-06 W5/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 5
Range: 06
Section: 22
County/Municipality: Stoney 142, 143, 144
Well Name: SHELL 33 UNIT 1 JUMPW 13-22-25-6
Operator Name: Shell Canada Limited
License Number: 0126293
License Date: 1987-04-13
License Status: Amended
Spud Date: 1987-04-13
Final Drill Date: 1987-06-28
Well Total Depth: 3705.00 m
Surface Hole Latitude: 51.147753
Surface Hole Longitude: -114.767654

For data sources see[1][2]

Well History

Date Event
1987-04-13 Obtained License
1987-04-18 Surface Casing Operation Performed
1987-04-20 Direction Drilling Operation Performed - Deviate
1987-06-28 Finished Drilling
1987-06-28 Well Mode changed to Drilled and Cased
1987-06-29 Well Log Performed
1987-07-02 Intermediate Casing Operation Performed
1987-07-02 Liner Casing Operation Performed
1987-07-05 Rig Released
1987-07-22 Well Log Performed
1987-08-09 Perforation Treatment Performed - Jet Perforation
1987-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-29 Perforation Treatment Performed - Fractured
1987-11-26 Well Began Production
1987-11-26 Well Fluid changed to Gas
1987-11-26 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-04-20 471.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-08-09 Perforation 3450.00 3451.00 3
1987-08-09 Perforation 3525.00 3534.50 3
1987-08-09 Perforation 3537.50 3539.50 3
1987-08-09 Perforation 3545.50 3550.50 3
1987-08-09 Perforation 3552.50 3554.00 3
1987-08-09 Perforation 3557.00 3558.00 3
1987-08-09 Perforation 3561.50 3564.50 3
1987-08-09 Perforation 3566.00 3567.00 3
1987-08-09 Perforation 3568.00 3573.00 3
1987-08-09 Perforation 3575.00 3600.00 3
1987-08-12 Acid Treatment 3450.00 3600.00 0
1987-08-09 Perforation 3452.00 3453.00 3
1987-08-29 Fracture 3450.00 3600.00 0
1987-08-09 Perforation 3455.00 3459.00 3
1987-08-09 Perforation 3460.00 3465.00 3
1987-08-09 Perforation 3474.00 3481.00 3
1987-08-09 Perforation 3483.00 3484.00 3
1987-08-09 Perforation 3489.00 3494.00 3
1987-08-09 Perforation 3498.00 3500.00 3
1987-08-09 Perforation 3501.00 3507.50 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 421 0.0 0.0 0.0
1988 4028 0.0 0.0 0.0
1989 4584 0.0 0.0 0.0
1990 5083 0.0 0.0 0.0
1991 6370 0.0 0.0 0.0
1992 7696 0.0 0.0 0.0
1993 8382 0.0 0.0 0.0
1994 8545 0.0 0.0 0.0
1995 8224 0.0 0.0 0.0
1996 8622 0.0 0.0 0.0
1997 8250 0.0 0.0 0.0
1998 8590 0.0 0.0 0.0
1999 8680 0.0 0.0 0.0
2000 8732 0.0 0.0 0.0
2001 8725 0.0 0.0 0.0
2002 8735 0.0 0.0 0.0
2003 8369 0.0 0.0 0.0
2004 8763 0.0 0.0 0.0
2005 8613 0.0 0.0 0.0
2006 8716 0.0 0.0 0.0
2007 8545 0.0 0.0 0.0
2008 8775 0.0 0.0 0.0
2009 6904 0.0 0.0 0.0
2010 8676 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 8731 0.0 0.0 0.0
2013 8289 0.0 0.0 0.0
2014 8229 0.0 0.0 0.0
2015 8507 0.0 0.0 0.0
2016 8596 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References