X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264111311025

Well Details

Well ID: 0264111311025
Loading map...
Location: 02/11-13-026-11W4/5
Location Alias: 02/11-13-26-11 W4M
Location Alias 2: 02/11-13-026-11 W4/05
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 11
Section: 13
County/Municipality: Special Areas No. 2
Well Name: SOC SUNNYN 11-13-26-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0272566
License Date: 2002-08-12
License Status: Suspension
Spud Date: 2002-08-16
Final Drill Date: 2002-08-20
Well Total Depth: 1040.00 m
Surface Hole Latitude: 51.223381
Surface Hole Longitude: -111.412533

For data sources see[1][2]

Well History

Date Event
2002-08-12 Obtained License
2002-08-17 Surface Casing Operation Performed
2002-08-19 Well Log Performed
2002-08-20 Drill Stem Test Performed
2002-08-20 Finished Drilling
2002-08-20 Production Casing Operation Performed
2002-08-20 Well Mode changed to Drilled and Cased
2002-08-21 Rig Released
2002-09-16 Perforation Treatment Performed - Jet Perforation
2002-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-18 Perforation Treatment Performed - Jet Perforation
2002-09-18 Plug Back Performed
2002-09-19 Perforation Treatment Performed - Fractured
2002-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-23 Plug Back Performed
2002-09-24 Perforation Treatment Performed - Jet Perforation
2002-09-27 Perforation Treatment Performed - Jet Perforation
2007-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-01 Plug Back Performed
2007-02-01 Well Log Performed
2007-02-03 Perforation Treatment Performed - Jet Perforation
2007-02-07 Well Began Production
2007-02-07 Well Fluid changed to Gas
2007-02-07 Well Mode changed to Flowing
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-16 Perforation 1006.00 1007.00 20
2007-02-03 Perforation 844.50 846.00 17
2002-09-16 Perforation 1008.00 1008.50 20
2002-09-18 Packing Device Capped w/Cement 995.00 1003.00 0
2002-09-18 Perforation 985.00 989.00 20
2002-09-19 Fracture 985.00 989.00 0
2002-09-23 Packing Device Capped w/Cement 972.00 980.00 0
2002-09-24 Perforation 913.00 915.00 20
2002-09-27 Perforation 825.50 826.50 20
2007-02-01 Packing Device Capped w/Cement 852.00 860.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7271 0.0 0.0 0.0
2008 744 0.0 0.0 0.0

For data sources see[5]

References