If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264292507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.247062,"lon":-113.919981,"icon":""}]} |
Location: 00/07-25-026-29W4/0 | |
Location Alias: 00/07-25-26-29 W4M | |
Location Alias 2: 00/07-25-026-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 29 | |
Section: 25 | |
County/Municipality: Rocky View County | |
Well Name: JEFF LAKE ET AL CROSS 7-25-26-29 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0028060 | |
License Date: 1965-03-29 | |
License Status: Abandoned | |
Spud Date: 1965-03-30 | |
Final Drill Date: 1965-05-28 | |
Well Total Depth: 2661.50 m | |
Surface Hole Latitude: 51.247062 | |
Surface Hole Longitude: -113.919981 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-03-29 | Obtained License |
1965-05-12 | Drill Stem Test Performed |
1965-05-13 | Liner Casing Operation Performed |
1965-05-28 | Finished Drilling |
1965-05-28 | Perforation Treatment Performed - Open-Hole Completion |
1965-05-29 | Drill Stem Test Performed |
1965-06-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-06-10 | Perforation Treatment Performed - Condensate Squeeze |
1965-08-01 | Well Mode changed to Drilled and Cased |
1967-03-02 | Perforation Treatment Performed - Condensate Squeeze |
1967-03-08 | Perforation Treatment Performed - Condensate Squeeze |
1967-03-17 | Perforation Treatment Performed - Condensate Squeeze |
1967-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-03-23 | Perforation Treatment Performed - Condensate Squeeze |
1967-03-30 | Perforation Treatment Performed - Condensate Squeeze |
1967-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-04-11 | Well Began Production |
1967-04-11 | Well Fluid changed to Gas |
1967-04-11 | Well Mode changed to Flowing |
1978-07-12 | Perforation Treatment Performed - Cement Squeeze |
1978-08-01 | Perforation Treatment Performed - Jet Perforation |
1978-08-02 | Perforation Treatment Performed - Fractured |
1982-02-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-02-15 | Well Abandoned |
1982-02-15 | Well Fluid changed to Gas |
1982-02-15 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-05-28 | Open Hole/Barefoot Completion | 2631.90 | 2661.50 | 0 |
1967-03-30 | Condensate Squeeze | 2631.90 | 2661.50 | 0 |
1967-04-06 | Acid Treatment | 2631.90 | 2661.50 | 0 |
1978-07-12 | Cement Squeeze | 2631.90 | 2658.60 | 0 |
1978-08-01 | Perforation | 2636.80 | 2637.70 | 13 |
1978-08-01 | Perforation | 2638.30 | 2638.30 | 13 |
1978-08-01 | Perforation | 2639.60 | 2640.50 | 13 |
1978-08-01 | Perforation | 2641.10 | 2642.00 | 13 |
1978-08-01 | Perforation | 2642.90 | 2643.80 | 13 |
1978-08-02 | Fracture | 2636.80 | 2643.80 | 0 |
1982-02-15 | Packing Device Capped w/Cement | 2513.20 | 2521.20 | 0 |
1965-06-10 | Hydra Jet Perforation | 2645.70 | 2645.70 | 0 |
1965-06-10 | Condensate Squeeze | 2631.90 | 2661.50 | 0 |
1967-03-02 | Condensate Squeeze | 2631.90 | 2661.50 | 0 |
1967-03-08 | Condensate Squeeze | 2631.90 | 2661.50 | 0 |
1967-03-17 | Condensate Squeeze | 2631.90 | 2661.50 | 0 |
1967-03-18 | Acid Treatment | 2631.90 | 2661.50 | 0 |
1967-03-21 | Acid Treatment | 2631.90 | 2661.50 | 0 |
1967-03-23 | Condensate Squeeze | 2631.90 | 2661.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 767 | 0.0 | 0.0 | 0.0 |
1969 | 3291 | 0.0 | 0.0 | 0.0 |
1970 | 5231 | 0.0 | 0.0 | 0.0 |
1971 | 6761 | 0.0 | 0.0 | 0.0 |
1972 | 6976 | 0.0 | 0.0 | 0.0 |
1973 | 8394 | 0.0 | 0.0 | 0.0 |
1974 | 8425 | 0.0 | 0.0 | 0.0 |
1975 | 7822 | 0.0 | 0.0 | 0.0 |
1976 | 6959 | 0.0 | 0.0 | 0.0 |
1977 | 7609 | 0.0 | 0.0 | 0.0 |
1978 | 7227 | 0.0 | 0.0 | 0.0 |
1979 | 3493 | 0.0 | 0.0 | 0.0 |
1980 | 904 | 0.0 | 0.0 | 0.0 |
For data sources see[5]