X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264292507000

Well Details

Well ID: 0264292507000
Loading map...
Location: 00/07-25-026-29W4/0
Location Alias: 00/07-25-26-29 W4M
Location Alias 2: 00/07-25-026-29 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 29
Section: 25
County/Municipality: Rocky View County
Well Name: JEFF LAKE ET AL CROSS 7-25-26-29
Operator Name: CNOOC Petroleum North America ULC
License Number: 0028060
License Date: 1965-03-29
License Status: Abandoned
Spud Date: 1965-03-30
Final Drill Date: 1965-05-28
Well Total Depth: 2661.50 m
Surface Hole Latitude: 51.247062
Surface Hole Longitude: -113.919981

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-29 Obtained License
1965-05-12 Drill Stem Test Performed
1965-05-13 Liner Casing Operation Performed
1965-05-28 Finished Drilling
1965-05-28 Perforation Treatment Performed - Open-Hole Completion
1965-05-29 Drill Stem Test Performed
1965-06-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-06-10 Perforation Treatment Performed - Condensate Squeeze
1965-08-01 Well Mode changed to Drilled and Cased
1967-03-02 Perforation Treatment Performed - Condensate Squeeze
1967-03-08 Perforation Treatment Performed - Condensate Squeeze
1967-03-17 Perforation Treatment Performed - Condensate Squeeze
1967-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-03-23 Perforation Treatment Performed - Condensate Squeeze
1967-03-30 Perforation Treatment Performed - Condensate Squeeze
1967-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-11 Well Began Production
1967-04-11 Well Fluid changed to Gas
1967-04-11 Well Mode changed to Flowing
1978-07-12 Perforation Treatment Performed - Cement Squeeze
1978-08-01 Perforation Treatment Performed - Jet Perforation
1978-08-02 Perforation Treatment Performed - Fractured
1982-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-15 Well Abandoned
1982-02-15 Well Fluid changed to Gas
1982-02-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-05-28 Open Hole/Barefoot Completion 2631.90 2661.50 0
1967-03-30 Condensate Squeeze 2631.90 2661.50 0
1967-04-06 Acid Treatment 2631.90 2661.50 0
1978-07-12 Cement Squeeze 2631.90 2658.60 0
1978-08-01 Perforation 2636.80 2637.70 13
1978-08-01 Perforation 2638.30 2638.30 13
1978-08-01 Perforation 2639.60 2640.50 13
1978-08-01 Perforation 2641.10 2642.00 13
1978-08-01 Perforation 2642.90 2643.80 13
1978-08-02 Fracture 2636.80 2643.80 0
1982-02-15 Packing Device Capped w/Cement 2513.20 2521.20 0
1965-06-10 Hydra Jet Perforation 2645.70 2645.70 0
1965-06-10 Condensate Squeeze 2631.90 2661.50 0
1967-03-02 Condensate Squeeze 2631.90 2661.50 0
1967-03-08 Condensate Squeeze 2631.90 2661.50 0
1967-03-17 Condensate Squeeze 2631.90 2661.50 0
1967-03-18 Acid Treatment 2631.90 2661.50 0
1967-03-21 Acid Treatment 2631.90 2661.50 0
1967-03-23 Condensate Squeeze 2631.90 2661.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 767 0.0 0.0 0.0
1969 3291 0.0 0.0 0.0
1970 5231 0.0 0.0 0.0
1971 6761 0.0 0.0 0.0
1972 6976 0.0 0.0 0.0
1973 8394 0.0 0.0 0.0
1974 8425 0.0 0.0 0.0
1975 7822 0.0 0.0 0.0
1976 6959 0.0 0.0 0.0
1977 7609 0.0 0.0 0.0
1978 7227 0.0 0.0 0.0
1979 3493 0.0 0.0 0.0
1980 904 0.0 0.0 0.0

For data sources see[5]

References