X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265083604000

Well Details

Well ID: 0265083604000
Loading map...
Location: 00/04-36-026-08W5/0
Location Alias: 00/04-36-26-08 W5M
Location Alias 2: 00/04-36-026-08 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 08
Section: 36
County/Municipality: Stoney 142, 143, 144
Well Name: Canlin SALTER 4-36-26-8
Operator Name: Canlin Energy Corporation
License Number: 0043378
License Date: 1972-08-25
License Status: Issued
Spud Date: 1972-09-18
Final Drill Date: 1972-12-20
Well Total Depth: 2795.00 m
Surface Hole Latitude: 51.256514
Surface Hole Longitude: -115.001532

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-08-25 Obtained License
1972-12-20 Finished Drilling
1972-12-22 Well Log Performed
1972-12-23 Production Casing Operation Performed
1973-01-02 Perforation Treatment Performed - Jet Perforation
1973-01-02 Perforation Treatment Performed - Selective Jet Perforations
1973-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-11 Perforation Treatment Performed - Selective Jet Perforations
1973-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-22 Perforation Treatment Performed - Jet Perforation
1973-01-22 Perforation Treatment Performed - Selective Jet Perforations
1973-04-06 Well Mode changed to Drilled and Cased
1990-04-06 Well Began Production
1990-04-06 Well Fluid changed to Gas
1990-04-06 Well Mode changed to Flowing
1991-10-31 Well Log Performed
2011-07-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-02 Selective Jet Perforations 2691.10 2691.70 3
1973-01-02 Perforation 2628.60 2629.20 3
1973-01-02 Selective Jet Perforations 2630.70 2632.60 0
1973-01-02 Selective Jet Perforations 2634.10 2635.30 0
1973-01-02 Selective Jet Perforations 2635.90 2636.20 0
1973-01-02 Selective Jet Perforations 2639.90 2640.50 0
1973-01-02 Selective Jet Perforations 2660.00 2660.00 0
1973-01-02 Perforation 2645.40 2649.00 3
1973-01-10 Acid Treatment 2628.60 2692.90 0
1973-01-11 Selective Jet Perforations 2606.00 2607.60 0
1973-01-11 Selective Jet Perforations 2608.50 2610.60 0
1973-01-02 Selective Jet Perforations 2692.30 2692.90 0
1973-01-11 Selective Jet Perforations 2611.20 2611.80 0
1973-01-11 Selective Jet Perforations 2614.00 2614.90 0
1973-01-11 Selective Jet Perforations 2615.50 2617.30 0
1973-01-11 Selective Jet Perforations 2592.90 2594.20 0
1973-01-11 Selective Jet Perforations 2596.60 2598.70 0
1973-01-11 Selective Jet Perforations 2599.30 2600.20 0
1973-01-11 Selective Jet Perforations 2601.80 2603.30 0
1973-01-11 Selective Jet Perforations 2603.90 2605.10 0
1973-01-11 Selective Jet Perforations 2577.70 2582.60 0
1973-01-11 Selective Jet Perforations 2583.70 2584.70 0
1973-01-02 Selective Jet Perforations 2670.40 2671.00 3
1973-01-11 Selective Jet Perforations 2566.70 2567.30 0
1973-01-11 Selective Jet Perforations 2568.20 2569.80 0
1973-01-11 Selective Jet Perforations 2570.40 2570.40 0
1973-01-21 Acid Treatment 2565.50 2617.30 0
1973-01-22 Perforation 2603.00 2612.40 7
1973-01-22 Perforation 2614.00 2615.80 7
1973-01-22 Perforation 2617.00 2617.60 7
1973-01-22 Perforation 2577.10 2578.90 7
1973-01-22 Perforation 2582.30 2584.70 7
1973-01-22 Perforation 2542.00 2542.60 7
1973-01-02 Selective Jet Perforations 2672.20 2672.50 0
1973-01-22 Perforation 2543.90 2546.00 7
1973-01-22 Selective Jet Perforations 2557.00 2591.40 7
1973-01-22 Selective Jet Perforations 2592.90 2594.20 7
1973-01-22 Perforation 2596.00 2597.50 7
1973-01-22 Perforation 2598.70 2600.90 7
1973-01-22 Perforation 2565.20 2567.60 7
1973-01-02 Selective Jet Perforations 2673.40 2675.80 0
1973-01-02 Selective Jet Perforations 2676.80 2677.10 0
1973-01-02 Perforation 2678.60 2679.80 3
1973-01-02 Perforation 2680.70 2681.30 3
1973-01-02 Perforation 2681.90 2682.80 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 163 0.0 0.0 0.0
1990 5344 0.0 0.0 0.0
1991 7300 0.0 0.0 0.0
1992 8078 0.0 0.0 0.0
1993 8162 0.0 0.0 0.0
1994 8726 0.0 0.0 0.0
1995 8655 0.0 0.0 0.0
1996 8750 0.0 0.0 0.0
1997 8582 0.0 0.0 0.0
1998 7533 0.0 0.0 0.0
1999 7268 0.0 0.0 0.0
2000 8757 0.0 0.0 0.0
2001 7268 0.0 0.0 0.0
2002 8696 0.0 0.0 0.0
2003 8758 0.0 0.0 0.0
2004 8770 0.0 0.0 0.0
2005 7924 0.0 0.0 0.0
2006 8704 0.0 0.0 0.0
2007 8333 0.0 0.0 0.0
2008 8444 0.0 0.0 0.0
2009 8286 0.0 0.0 0.0
2010 8683 0.0 0.0 0.0
2011 8560 0.0 0.0 0.0
2012 8777 0.0 0.0 0.0
2013 7471 0.0 0.0 0.0
2014 8619 0.0 0.0 0.0
2015 8590 0.0 0.0 0.0
2016 8660 0.0 0.0 0.0
2017 8537 0.0 0.0 0.0
2018 7950 0.0 0.0 0.0
2019 6537 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References