X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274013004003

Well Details

Well ID: 0274013004003
Loading map...
Location: 00/04-30-027-01W4/3
Location Alias: 00/04-30-27-01 W4M
Location Alias 2: 00/04-30-027-01 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 01
Section: 30
County/Municipality: Special Areas No. 3
Well Name: BP SIBBALD 4-30-27-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0082713
License Date: 1980-05-09
License Status: RecCertified
Spud Date: 1980-05-14
Final Drill Date: 1980-07-28
Well Total Depth: 926.00 m
Surface Hole Latitude: 51.332077
Surface Hole Longitude: -110.144940

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-09 Obtained License
1980-07-28 Finished Drilling
1980-07-29 Production Casing Operation Performed
1980-08-01 Perforation Treatment Performed - Jet Perforation
1980-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-09 Perforation Treatment Performed - Fractured
1980-10-20 Perforation Treatment Performed - Jet Perforation
1980-10-20 Well Mode changed to Drilled and Cased
1982-01-12 Well Began Production
1982-01-12 Well Fluid changed to Gas
1982-01-12 Well Mode changed to Flowing
1990-02-15 Well Fluid changed to Gas
1990-02-15 Well Mode changed to Suspended
1992-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-15 Plug Back Performed
1992-11-18 Perforation Treatment Performed - Jet Perforation
1992-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-20 Perforation Treatment Performed - Remedial Casing
1992-11-20 Well Fluid changed to Gas
1992-11-20 Well Mode changed to Abandoned
1992-11-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-01 Perforation 877.50 882.00 6
1992-11-20 Packing Device Capped w/Cement 243.00 250.00 0
1980-08-01 Perforation 883.00 884.00 6
1980-08-06 Acid Treatment 877.50 884.00 0
1980-08-09 Fracture 877.50 884.00 0
1980-10-20 Perforation 755.00 757.00 7
1992-11-15 Packing Device Capped w/Cement 849.70 857.70 0
1992-11-15 Packing Device Capped w/Cement 742.00 750.00 0
1992-11-18 Perforation 255.00 255.30 39
1992-11-20 Remedial Casing Cementing 255.00 255.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 8185 0.0 0.0 0.0
1983 4620 0.0 0.0 0.0
1984 840 0.0 0.0 0.0
1985 750 0.0 0.0 0.0
1986 437 0.0 0.0 0.0
1987 1105 0.0 0.0 0.0
1988 524 0.0 0.0 0.0
1989 5522 0.0 0.0 0.0
1990 115 0.0 0.0 0.0

For data sources see[5]

References