X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274022501002

Well Details

Well ID: 0274022501002
Loading map...
Location: 00/01-25-027-02W4/2
Location Alias: 00/01-25-27-02 W4M
Location Alias 2: 00/01-25-027-02 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 02
Section: 25
County/Municipality: Special Areas No. 3
Well Name: STARPOINT SIBB 1-25-27-2
Operator Name: Obsidian Energy Ltd.
License Number: 0099358
License Date: 1982-11-29
License Status: Suspension
Spud Date: 1982-12-14
Final Drill Date: 1982-12-17
Well Total Depth: 910.00 m
Surface Hole Latitude: 51.331274
Surface Hole Longitude: -110.149146

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-29 Obtained License
1982-12-17 Finished Drilling
1982-12-17 Well Log Performed
1982-12-18 Drill Stem Test Performed
1982-12-19 Production Casing Operation Performed
1983-03-02 Perforation Treatment Performed - Jet Perforation
1983-03-07 Perforation Treatment Performed - Jet Perforation
1983-03-08 Well Mode changed to Drilled and Cased
1983-12-09 Well Began Production
1983-12-09 Well Fluid changed to Gas
1983-12-09 Well Mode changed to Flowing
1988-10-21 Well Fluid changed to Gas
1988-10-21 Well Mode changed to Suspended
1991-05-24 Well Log Performed
1991-05-25 Perforation Treatment Performed - Jet Perforation
1991-05-25 Well Log Performed
1991-05-28 Perforation Treatment Performed - Cement Squeeze
1991-05-28 Plug Back Performed
1991-05-28 Well Fluid changed to Gas
1991-05-28 Well Mode changed to Abandoned Zone
1991-05-30 Perforation Treatment Performed - Casing Patch (Over Perfs)
1991-05-30 Perforation Treatment Performed - Jet Perforation
1991-05-30 Well Log Performed
2005-11-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-02 Perforation 877.00 879.50 13
1983-03-07 Perforation 753.00 755.00 13
1991-05-25 Perforation 753.00 755.00 13
1991-05-28 Cement Squeeze 753.00 755.00 0
1991-05-30 Perforation 876.00 882.00 13
1991-05-30 Casing Patch 753.00 755.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 580 0.0 0.0 0.0
1984 8779 0.0 0.0 0.0
1985 7978 0.0 0.0 0.0
1986 8664 0.0 0.0 0.0
1987 8239 0.0 0.0 0.0
1988 6575 0.0 0.0 0.0

For data sources see[5]

References