X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274112201000

Well Details

Well ID: 0274112201000
Loading map...
Location: 00/01-22-027-11W4/0
Location Alias: 00/01-22-27-11 W4M
Location Alias 2: 00/01-22-027-11 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 11
Section: 22
County/Municipality: Special Areas No. 2
Well Name: PDVL SUNNYN 1-22-27-11
Operator Name: Primrose Drilling Ventures Ltd.
License Number: 0142620
License Date: 1990-01-09
License Status: Suspension
Spud Date: 1990-02-23
Final Drill Date: 1990-02-26
Well Total Depth: 1105.00 m
Surface Hole Latitude: 51.317407
Surface Hole Longitude: -111.463361

For data sources see[1][2]

Well History

Date Event
1990-01-09 Obtained License
1990-02-24 Surface Casing Operation Performed
1990-02-26 Finished Drilling
1990-02-26 Well Log Performed
1990-02-26 Well Mode changed to Drilled and Cased
1990-02-27 Production Casing Operation Performed
1990-02-27 Rig Released
1990-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-08 Perforation Treatment Performed - Jet Perforation
1990-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-04-16 Perforation Treatment Performed - Jet Perforation
1990-04-16 Plug Back Performed
1990-07-14 Well Began Production
1990-07-14 Well Fluid changed to Gas
1990-07-14 Well Mode changed to Flowing
1993-01-08 Perforation Treatment Performed - Jet Perforation
1993-01-14 Well Fluid changed to Gas
1993-01-14 Well Mode changed to Flowing
1995-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-17 Plug Back Performed
1995-07-17 Well Abandoned
1995-07-17 Well Fluid changed to Gas
1995-07-17 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-08 Perforation 1069.00 1073.00 13
1990-03-08 Perforation 1074.50 1076.00 13
1990-03-08 Acid Treatment 1069.00 1076.00 0
1990-04-16 Packing Device Capped w/Cement 1057.00 1065.00 0
1990-04-16 Perforation 1040.00 1041.50 13
1993-01-08 Perforation 870.50 872.50 13
1995-07-17 Packing Device Capped w/Cement 1027.00 1035.00 0
1995-07-17 Packing Device Capped w/Cement 858.00 866.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3339 0.0 0.0 0.0
1991 8355 0.0 0.0 0.0
1992 8605 0.0 0.0 0.0
1993 7977 0.0 0.0 0.0
1994 1328 0.0 0.0 0.0

For data sources see[5]

References