If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274272907000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.334101,"lon":-113.762008,"icon":""}]} |
| Location: 00/07-29-027-27W4/0 | |
| Location Alias: 00/07-29-27-27 W4M | |
| Location Alias 2: 00/07-29-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 29 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 7-29-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0426121 | |
| License Date: 2010-11-22 | |
| License Status: Issued | |
| Spud Date: 2010-12-30 | |
| Final Drill Date: 2011-01-08 | |
| Well Total Depth: 918.00 m | |
| Surface Hole Latitude: 51.334101 | |
| Surface Hole Longitude: -113.762008 |
| Date | Event |
|---|---|
| 2010-11-22 | Obtained License |
| 2010-12-30 | Surface Casing Operation Performed |
| 2011-01-08 | Finished Drilling |
| 2011-01-08 | Well Mode changed to Drilled and Cased |
| 2011-01-10 | Production Casing Operation Performed |
| 2011-01-10 | Rig Released |
| 2011-01-14 | Well Log Performed |
| 2011-02-14 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-07 | Perforation Treatment Performed - Fractured |
| 2011-03-10 | Well Fluid changed to Gas |
| 2011-03-10 | Well Mode changed to Testing |
| 2011-04-13 | Well Began Production |
| 2011-04-13 | Well Fluid changed to Gas |
| 2011-04-13 | Well Mode changed to Flowing |
| 2011-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-26 | Perforation Treatment Performed - Fractured |
| 2011-10-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-10-14 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-14 | Perforation | 863.50 | 864.50 | 13 |
| 2011-09-14 | Perforation | 249.50 | 251.50 | 13 |
| 2011-09-14 | Perforation | 309.50 | 311.50 | 13 |
| 2011-09-14 | Perforation | 357.90 | 358.40 | 13 |
| 2011-09-14 | Perforation | 358.70 | 359.20 | 13 |
| 2011-09-14 | Perforation | 374.50 | 376.50 | 13 |
| 2011-09-14 | Perforation | 412.50 | 414.50 | 13 |
| 2011-09-14 | Perforation | 439.60 | 440.10 | 13 |
| 2011-09-14 | Perforation | 463.90 | 464.40 | 13 |
| 2011-09-14 | Perforation | 473.00 | 475.00 | 13 |
| 2011-09-14 | Perforation | 476.00 | 476.50 | 13 |
| 2011-02-14 | Perforation | 615.00 | 617.00 | 13 |
| 2011-09-14 | Perforation | 489.40 | 490.90 | 13 |
| 2011-09-14 | Perforation | 524.00 | 525.50 | 13 |
| 2011-09-14 | Perforation | 564.00 | 567.00 | 13 |
| 2011-09-14 | Perforation | 587.00 | 588.00 | 13 |
| 2011-09-14 | Perforation | 590.00 | 592.00 | 13 |
| 2011-09-14 | Perforation | 594.00 | 596.00 | 13 |
| 2011-09-14 | Perforation | 602.10 | 602.60 | 13 |
| 2011-09-14 | Perforation | 611.00 | 613.00 | 13 |
| 2011-09-14 | Perforation | 621.50 | 622.00 | 13 |
| 2011-09-14 | Perforation | 624.30 | 624.80 | 13 |
| 2011-02-14 | Perforation | 370.50 | 372.50 | 13 |
| 2011-09-14 | Perforation | 677.60 | 678.10 | 13 |
| 2011-09-14 | Perforation | 680.60 | 681.10 | 13 |
| 2011-09-14 | Perforation | 684.60 | 686.10 | 13 |
| 2011-09-14 | Perforation | 689.50 | 691.50 | 13 |
| 2011-09-14 | Perforation | 705.50 | 707.50 | 13 |
| 2011-09-14 | Perforation | 714.20 | 714.70 | 13 |
| 2011-09-14 | Perforation | 721.60 | 722.10 | 13 |
| 2011-09-14 | Perforation | 727.50 | 729.50 | 13 |
| 2011-09-14 | Perforation | 737.90 | 738.40 | 13 |
| 2011-09-14 | Perforation | 739.70 | 740.20 | 13 |
| 2011-03-07 | Fracture | 863.50 | 864.50 | 0 |
| 2011-09-14 | Perforation | 741.00 | 741.50 | 13 |
| 2011-09-14 | Perforation | 751.30 | 751.80 | 13 |
| 2011-09-14 | Perforation | 760.70 | 761.20 | 13 |
| 2011-09-14 | Perforation | 768.70 | 770.20 | 13 |
| 2011-09-14 | Perforation | 780.40 | 780.90 | 13 |
| 2011-09-26 | Fracture | 205.50 | 780.90 | 0 |
| 2011-03-07 | Fracture | 615.00 | 617.00 | 0 |
| 2011-03-07 | Fracture | 370.50 | 372.50 | 0 |
| 2011-09-14 | Perforation | 205.50 | 207.50 | 13 |
| 2011-09-14 | Perforation | 232.00 | 233.50 | 13 |
| 2011-09-14 | Perforation | 241.00 | 243.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5882 | 0.0 | 0.0 | 0.0 |
| 2012 | 8662 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8756 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]